MATERIALS HANDLING


Aerial conveying system at the Tüfentobel landfi ll site


COCLEVERNVEYING CONCEPT


Stefanie Reis details how an aerial conveying system used to backfi ll a valley was adapted to achieve an even more fl exible discharge point


Tüfentobel landfi ll site, which will eventually be backfi lled. T e belt is being extended in several stages. It discharges the material onto a stockpile directly where it is to be used. Finally, in March 2016, a novel concept was implemented that has further increased the fl exibility of the transport system. Relocating the discharge point of the


S


RopeCon system in various stages was part of the overall project plan from the very beginning. T e idea was to discharge the material at all times as close as possible to the location where it was to be used. T e discharge point has been relocated several times already since the installation went into operation, to keep transport routes as short as possible for both the trucks supplying the material and the bulldozers spreading it from the discharge point. In March 2016 a second RopeCon was fi nally installed directly into the rope support structure of the original system, which now discharges the material onto the new conveyor at a height of approximately 20m. T e new system can operate in both directions. T is allows for two diff erent discharge points that can be fed alternately. T e second system requires no support structure of its own but rather uses the track ropes of the original system. T e


46 www.engineerlive.com


ince the year 2005, an aerial conveying system has been transporting inert material along a long-stretched valley at the


Stage 1 of the backfi lling concept Stage 2 of the backfi lling concept


running wheels of the second installation return onto the track ropes on a set of rails. An important advantage of the extension concept was that even during the assembly work the original system could be kept in operation to the greatest extent possible. Long shut-down periods were thus avoided.


BACKFILLING CONCEPT FOR QUARRIES Using one continuous RopeCon support structure, but two or more separate belt loops, Doppelmayr’s backfi lling concept allows for several discharge points. A two-way chute at the transfer point makes it possible to switch between the discharge point and the transfer to the subsequent conveyor system. Discharge of


the material is, therefore, always close to the point, where it is needed. T is saves truck journeys to the bottom of the pit to discharge material there. An innovative concept also allows for adjustment of the discharge height in various phases: after phase 1 has been backfi lled completely, the discharge height is adjusted and backfi lling of the next layer starts. Depending on the requirements of the project, this step can be repeated as required. Keeping the discharge height small helps to reduce dust emissions at the discharge point.


Stefanie Reis is with Doppelmayr. www.doppelmayr-mts.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52