SUMMER 2018 Installation
The pictures show the finished installation. As required, the area can be enclosed with automatic roller shutters which allows equipment to be kept safely and the soft play area protected. We also added lights to ensure the space can be used safely all year round.
This project has given the school a brilliant new space that can be used for outdoor learning, activities and all-round fun. Effective, professional project management ensured a hassle-free installation that met the needs of the school perfectly.
Able Canopies Project Management Service Our approach to project management is based on four key principles. These are:
Safety ? we will ensure safe working through the training of our staff and the assessment of any additional sub-contractors and suppliers. We are independently audited for safety and have the necessary certification (Constructionline Gold & CHAS) to support our track record.
Quality ? a key component is to ensure all elements of the project are finished to the same high standard. We can therefore plan and execute projects professionally using trusted contractors to ensure a uniform quality finish. Our own commitment to quality is seen in our use of CE marked materials and ISO certification.
Cost management ? this is a key element and we work hard on cost research and purchasing at the planning stage to ensure there are no unexpected surprises and projects keep in their budgets.
On time finish ? through the use of expert planning (which includes drawings, and calculations where necessary), clear communication and our years of experience we are able to set up and deliver accurate project programmes.
Tech on the Beck
The Beck is a popular choice because of its simple and stylish looks. The usual tie rod fixings make for a strong and durable installation.
But what happens when the usual cannot be delivered and we have to come up with something unique?
The recent installation at Warwick University required completely bespoke first fix brackets which were co-ordinated between ourselves and the main contractor, a high-level C channel was installed to take the tie bar fixings and a more intricate low-level bracket set out specifically to suit our arm detail This was mostly worked from drawings rather than multiple site visits.
The cladding was then reinstated around the bracket and the canopy installed. Looks like it was always there!
Beck Tech Spec
- Unlimited length ? starting at 1.4m - Three practical projection sizes ? 1m, 1.2m & 1.5m - 4mm polycarbonate roof panels - High UV protection -
- 2-year guarantee Integrated guttering for a stylish finish
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8