search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
20 PROJECT REPORT - MEDIUM & HIGH RISE APARTMENTS


UK’s tallest residential tower protected by Advanced Fire Panels


in London. The installation of Advanced fire panels at the Landmark Pinnacle marks another tall-building win for the manufacturer who, in 2019, announced its specification at Western Europe’s second tallest building, 22 Bishopsgate. Standing 75 floors high at the head of the South Dock in the heart of Canary Wharf, the Landmark Pinnacle is the tallest residential building in Europe with more habitable floors than any other building in London, the UK and Europe. With prices starting from £480,000 and amenities including a roof garden, gym, private dining facilities and a cinema, London’s latest skyscraper, at 239 meters tall, offers stunning views across London and the surrounding counties.


G


lobal systems leader, Advanced, is celebrating being specified on yet another landmark development


Four market-leading 8-loop and two 4-loop intelligent MxPro 5 fire panels alongside three repeater panels specified for the tower have been installed by Bedfordshire-based Firelec Controls Limited – responsible for the design, installation, testing and commissioning of the fire system. The MxPro 5 panels, that were certified by FM Approvals to the EN54 standard in 2019, are be networked with the tower’s BMS using BACnet, include a custom graphics package and link to over 140 AOV vents and sprinklers with phased evacuation between floors. Richard Randall, Managing Director at Firelec,


said: “Advanced panels are our first choice every time, combining reliability and superior technical ability. Given the nature and size of the Landmark Pinnacle we needed a high level of protection to secure the public areas of the building and thanks to Advanced’s vast cause and effect capabilities they were the ideal solution for this installation project.” The MxPro 5 is the unbeatable multiprotocol


fire system. Approved to EN54-2,4&13, it offers four protocols, Apollo, Argus, Hotchiki and Nittan and a completely open installer network that benefits from free training and technical support. Panels can be used in single-loop, single-panel format or easily config- ured into high-speed, 200 panel networks covering huge areas. MxPro 5 panels are backwardly compatible with existing MxPro 4 networks and include a host of features includ-


WWW.HBDONLINE.CO.UK


ing AlarmCalm complete false alarm manage- ment and reduction. Amanda Hope, New Business Development


Manager at Advanced, said: “Landmark Pinnacle is the latest in a long line of tall buildings to benefit from Advanced protection, including western Europe’s tallest and second tallest buildings, the Shard and 22 Bishopsgate. Where complicated cause-and-effect programming is required, our panels deliver market-leading performance and protection and we’re thrilled to have been able to support Firelec with the equipment required.” Advanced is a world leader in the


development and manufacture of intelligent fire systems. The performance, quality and ease-of-use of its products see Advanced specified in locations all over the world, from single-panel installations to large multi-site networks. Advanced’s products include complete fire detection systems, multi-protocol fire panels, extinguishing control, fire paging and false alarm management systems.


0345 894 7000 www.advancedco.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68