Feature
This will typically include a weekly visual inspection of the plant, even in buildings that can be monitored remotely through the Building Management System. Moving parts like pumps should be kept operating for ten minutes once a week to help prevent them seizing and failing once the building is reactivated.
Avoiding water quality deterioration Water quality within domestic hot water systems must also be addressed.
HSE Approved Code of Practice HSG274 offers practical advice and guidance on the control of legionella bacteria in water systems in operational buildings. But what about a building that is closed for a short period of time? When the water system in a building is left to stagnate even for just a few weeks, water quality can deteriorate considerably. In a worst-case scenario, this can cause excessive corrosion of copper materials within the water system, a build-up of microbial activity on surfaces, and an increase in bacteria formation such as legionella.
Introducing fresh water through the domestic hot water (DWH) system can prevent this. We recommend:
• introducing fresh water into the DHW system at least once a week with regular water draw-offs from all outlets; • ensuring that the DWH return pump circulates water around the system for at least 10 minutes an hour, even when hot water is not required;
• heating the DHW tank to pasteurisation temperature (60-70ºC) for at least one continuous hour at least once a week to prevent bacteria forming.
It is critical when reactivating the building to implement a full water treatment and legionella prevention programme that will include pasteurisation, microbiological sampling and chlorination where required.
We won’t be alone in thinking that the changing COVID-19 situation has been a bit like doing the hokey cokey – are we in the building or out this month?
And while there is hope on the horizon with the emergence of a vaccine, a flexible approach to opening and closing buildings is likely to continue to be key in the months ahead to enable businesses and organisations to bounce back swiftly.
With robust planning, building operators, FM providers and heating engineers will be able to adapt rapidly the way they operate their systems to best meet the changing requirements related to differing occupancy rates and building usage. As with ‘normal’ maintenance programmes, it pays to be prepared.
fmuk 41
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44