STRUCTURAL COMPONENTS


Offsite, on time


Paul Newman of Potton Self Build explains the ins and outs of offsite construction, and the many benefits it holds for self builders


I


n many people’s minds, construction still happens ‘brick by brick’ on a building site. With the advent of offsite construction, however, more and more of the building process is happening in a factory environment. Contrary to what the term might suggest, offsite construction isn’t necessarily the delivery of a fully built house on the back of a lorry. It just means that elements of the build – in the case of timber-frame construction, the wall panels, roof structure, and potentially floor structure – are manufactured and part assembled in a factory. These sections are then delivered to site and the superstructure is erected. There are a number of important benefits to this prefabricated approach to housebuilding.


CONTRACTUAL RESPONSIBILITY Offsite construction is often offered as a package by companies, most of whom will deliver a build to a weathertight stage, and some of whom will offer a design service too. This ensures that the company has sole contractual responsibility for all of those build elements, so you know exactly who to contact if necessary.


SPEED


As you’d expect, the part-assembled nature of buildings constructed using timber frame means that, once the kit is delivered to site, this construction occurs extremely rapidly. Often, the superstructure is standing within a matter of weeks. This delivers it to a weathertight stage much sooner than a masonry build, allowing internal works to quickly start alongside external ones like cladding. Because of this, bricklaying can be removed from ‘critical paths’ in the construction programme.


DRY


The erection of a timber frame conforms to what’s known as a ‘dry’ method of building. This comes in very handy in the unpredictable (and often soggy) climes of the UK. Essentially, unless strong winds mean the operation of a crane is unsafe, there is virtually nothing to stop timber frames being erected. Where masonry builds have to stop, sometimes for weeks,


nov/dec 2020


because of wet or cold weather, timber frames can continue unimpeded.


QUALITY AND HEALTH & SAFETY As offsite construction takes place in a factory, it’s far easier to control the quality and manage any potential variables. Every panel is measured and manufactured exactly to the standards of the specific design, which produces a high level of dimensional accuracy. This higher level of accuracy allows for increased cost certainty, in comparison to other build methods. It also makes build times much more predictable, as there are virtually no ‘unknowns’ with a timber-frame build, which could otherwise incur significant delays and therefore additional cost.


The quality of the finished goods is checked and verified even before they leave the factory. Factory Production Control systems are used which cover manufacturing quality, health and safety and environmental sustainability, and these are audited independently each year. Moreover, by moving work that would otherwise be carried out onsite into a quality-controlled factory environment, health and safety performance is significantly improved.


Wood is also a ‘carbon store,’ i.e. using timber will retain carbon that would otherwise have contributed to greenhouse gases


SUSTAINABILITY


Timber frame is one of the most sustainable mainstream construction methods. FSC and PEFC certification bodies ensure the timber and timber products are sourced from sustainable forests, which plant more trees than they harvest. Even the OSB (oriented strand board), chipboard, and plywood that make up offsite panels and/or floors is harvested from sustainably sourced timber.


www.sbhonline.co.uk 37


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100