CASE STUDY 23
that is not only cost-effective, but also “serves the needs of modern living.” Before the show homes were delivered to the site in Gallions Reach, the foundations, services, drainage and much of the landscaping was already complete, and no scaffolding was required.
Bjorn Conway described the speedy nature of the process: “The crane arrived in the morning, placed the units, and was dismantled on the same day. “The homes were fully furnished, landscaped, and operational for the launch event less than two weeks later.” The modules themselves leave the factory virtually complete inside and out, ready to be installed. This stage also includes the incorporation of any individual consumer specifications, such as flooring, tiling, light fittings, appliances, and in some cases, even beds, fixtures and fittings. At this point, onsite preparation works and build manufacturing are undertaken simultaneously.
Once the site has been prepared, the modules are transported by truck. The company plans to build a series of plants around the UK to deal with demand at a regional level.
Exploring the benefits of the offsite method, the CEO said: “Due to the factory build quality control, we guarantee consis- tent high-quality, energy efficient homes which are typically constructed in less than half the time of traditionally built houses. “This approach results in a reduction in defect rectification and anticipated maintenance costs.”
As the modules are fully constructed in the factory, by the time properties arrive on site the homes can be fitted in a single day. The firm is currently able to install up to six properties per day, meaning the timeframe from installation of the homes to families moving in can take just two weeks, and provides a reliable and predictable timeline to work with. For a medium-sized site, this could speed up build times considerably, leading to a build programme that is six months faster than a traditional site.
This adds another benefit to local residents. “Ensuring minimum disruption to existing residents and the wider community is a crucial consideration for us,” said Conway. “Our installation is quick and efficient, with vehicles used on site kept to a minimum.”
A recent ilke Homes installation at the Dominion development in Doncaster used only five heavy goods vehicles in total, including the crane. This approach not only results in a much quieter site, but one that is safer and more controlled. “We have also had comments from the wider community at Gallions Reach that our houses appeared to ‘pop up’ in
one day,” he continued, “as they weren’t there in the morning and were fully installed when people returned from work that evening.”
THE HOMES
The internal and external surfaces of ilke Homes match those commonly used in traditional construction, including plaster- board, skirting boards, tiling and render, brick slip and PVCu. Precision-cut, high-grade galvanised steel frames and other durable, high performance materials are intended to give the homes the inherent strength and weight to enable them to be transported and lifted into place.
All properties by ilke Homes have a build fabric that exceeds Building Regulations by 20 per cent as standard due to the air tight, super-insulated and thermal bridge-free design.
ilke Homes works with NHBC to gain an NHBC Buildmark Warranty for its homes, and the LABC on building control approval. As part of its BOPAS approval, Building Life Plans (BLP) has also confirmed that the durability and mainte- nance requirements of ilke Homes are similar to that of traditionally built homes. Light is maximised thanks to the 2.5m floor to ceiling height, and large windows ensure maximum daylighting and airflow. Noise is also minimised, with acoustic testing showing the properties to be a third quieter than traditionally built homes. The high-performance envelope of the proper- ties, with factory built quality control, also allows the homes to reduce running costs when compared to typical builds. The homes benefit from a number of
energy efficient features, including ‘A’ rated boilers, improved air tightness, and reduced thermal bridging as a result of the company’s warm-frame design. The base specification for the properties exceed building regulation carbon targets by 12 per cent, and with the addition of solar photovoltaic (PV) panels, can be built to the zero-carbon home standard. The homes at Gallions Reach were fitted with solar PV and battery storage, heat pump ventilation, smart heating controls, as well an electric vehicle charging point. This means that electrical power within the properties can be generated, stored and used efficiently within the home. “These features have been incorporated with energy-efficiency in mind,” said Conway, “and will ultimately result in lower energy bills for the families who occupy the homes.”
SUCCESS Since opening in May last year, Bjorn he reports that there has already been “widespread interest” in the homes, with
ILKE HOMES IS CURRENTLY ONE OF THE UK’S ONLY MODULAR HOMES BUSINESSES SET UP TO OPERATE AT SCALE
development and maintenance teams from over 60 organisations visiting the site to understand ilke Homes’ approach to partnering, and to see the quality of the finished houses. The CEO explained the company’s plans for the future: “Our vision is to build high- quality homes for all, with an emphasis on medium density, low-rise houses and apart- ments (up to four storeys).
“This means that we will be able to deliver much-needed family housing to local authorities, housing associations and developers.” He concluded: “The UK is currently in the midst of a housing crisis, which the construction sector has had difficulties addressing for many years, and we’re looking forward to helping people across the UK to enjoy a home of their own.”
WWW.HBDONLINE.CO.UK
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52