DESIGNERS ENERGISED BY OFFSHORE WIND OPPORTUNITIES


"The offshore wind sector directly challenges ship designers to innovate which is precisely why Houlder has enjoyed success recently" says Mike Simpson, the company’s Marine Design Consultancy Director. He continues “Stakeholders in offshore wind have a distinct set of fleet requirements complicated by environmental design constraints and capital and operational cost drivers. These have inspired our people to look for new solutions and this, combined with expertise gained through years of offshore innovation, means we are well placed to drive things forward.”


PROGRESS


The company has provided maritime design and analysis, engineering and project development services as an independent consultancy for over thirty years. Today, it employs 150 naval architecture and engineering professionals in the UK and USA.


Over the last five years in particular, Houlder has deployed its marine and oil & gas pedigree to support emerging markets. Progress has been good and Houlder was recently named one of the UK’s fastest growing companies by SMARTA’s Breakthrough50 initiative.


MULTI-DISCIPLINED TEAMS Clients, be they the utilities, installation and maintenance contractors or vessel owners and operators, expect the full range of analysis and engineering from Houlder’s multi-disciplinary teams. These combine creativity and pragmatism to develop new concepts, aid decision making and validate project safety, performance and feasibility – all vital steps in planning future offshore energy infrastructure.


PROUD HISTORY


Houlder can trace its history of marine innovation back over a century through The Houlder Brother’s Shipping Line. The company is also still well known for supporting North Sea Oil & Gas exploration in the 1970s and 80s. The current management team have decades of experience designing special purpose vessels, pipe and cable layers, offshore support ships, floating accommodation, passenger transport and construction vessels.


EXPERTISE AND KNOWLEDGE The company’s naval architects and marine engineers are experts in offshore operations and apply that knowledge as they develop vessels from concept through to detailed design. They also design, fabricate and mobilise new equipment; develop deck modifications; upgrade operational equipment and manage extensive conversion, life extension and change of use projects. All of these are driven by the ever-increasing need for more capacity and improved capability.


Whatever the task, Houlder quickly gets to the detail and provides answers using a range tools and up-to-date software all underpinned by significant knowledge of Class Rules and industry regulation. All deliverables – design reports, calculations, drawings, graphics and animations - focus on giving clients the confidence to invest, build, operate and maintain vessels and equipment.


WINDFARM INSTALLATION VESSELS Houlder gained a wealth of experience of turbine installation by developing the design of the Gaoh Offshore Deepwater Installer 1 vessel. The Jack up design was one of the first to address year round operations in mid North Sea locations with water depths of up to 50mts. The Deepwater Installer answers the technical challenge of installing the most distant planned offshore wind farms by providing optimised storage and lifting capacity – the latter via a 1,600t crane.


The design was also optimised to minimise downtime in port. This ensures installation costs per turbine are minimised by balancing capacity, transit speeds and loading times. Houlder developed the design and shipyard specification for the vessel and the lessons learned are currently being applied to other installation vessel projects. In particular, Houlder has developed expertise in deep water jacking operations including leg design and analysis for operation in up to 60m water depths.


76


www.windenergynetwork.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100