This page contains a Flash digital edition of a book.
“Our focus was on reducing expensive setup times. We needed to significantly extend our machine-side tool stor- age capability,” said Philipp Schneider, head of department at this branch of the group. Thus, the tool storage was upgraded from 80 to a total of 320 spaces and the modular, flexible-configuration rack columns were designed to enable even customer-specific requests to be promptly met. The equipment featured an all-purpose design to pro- vide as much flexibility as possible. During the period when the RLS was integrated into the existing solution, Liebherr worked closely with machining center builder Heckert. Together the two companies sorted out the interface issues between both systems.


Another important point is that operators like working on the RLS. The integrated setup space is located right next to the operator’s side of the machine. The system’s special de- sign enables users to access the automation unit easily. The surrounding window panels in combination with the well-laid- out user interface provide an overview of what’s happening in and around the RLS. Through the intuitive-to-use cell controller software and the graphic user interface, the required functions can be conveniently activated via “drag and drop.” The software, like the entire system, features a modular design. A range of different add-on packages can be hitched onto the basic package to enhance functionality so Liebherr can adapt new applications to deliver process reliability without having to modify the existing computer system. The switch to the RLS for small-batch production is pay- ing dividends for Berger, particularly in terms of efficiency, customer focus, and delivery capability. Given its newly acquired flexibility, the company is able to react immediately even to really short-notice changes in demand. Customers are supplied on time with exactly the models in the quantities they require and are therefore capable of reacting faster in changing market situations. The RLS has also reduced the manufacturing cost impact of setup times significantly and enables more productive use of machining center time cutting parts. The RLS allows operators to set up jobs in parallel with machining time. So the machine tool is not waiting on the next job, thus ensuring that setup costs are not absorbed in machine hour rates. This RLS concept optimizes spindle utilization and maxi- mizes production output. Even an unmanned third shift would


be feasible. Another effect of this changed production philoso- Continued on P116


July 2016 | AdvancedManufacturing.org 49


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200  |  Page 201  |  Page 202  |  Page 203  |  Page 204  |  Page 205  |  Page 206  |  Page 207  |  Page 208  |  Page 209  |  Page 210  |  Page 211  |  Page 212  |  Page 213  |  Page 214  |  Page 215  |  Page 216  |  Page 217  |  Page 218  |  Page 219  |  Page 220  |  Page 221  |  Page 222  |  Page 223  |  Page 224