resulting from feedback to the PEI consultation. With regard to onshore topics, section 3.2 identifies where additional information is expected from third parties or where some data gathering is required. The final ES will therefore update these assessments and incorporate any changes resulting from consultation.
3.5 Topics removed from the assessment
74. Having considered the following topics, it was agreed that they could be scoped out of the assessment:
75.
Air quality during operation (offshore and onshore); Airborne noise (offshore); and Traffic disruption during operation.
Further detail on these topics, and the reasons for removing them from the assessment, can be found in the East Anglia THREE Scoping Report, and the Planning Inspectorate Scoping Opinion for East Anglia THREE Offshore Windfarm, both of which are available on the project website. The details of this website are available in section 4 of this document.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Non-Technical Summary Page 15
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20