This page contains a Flash digital edition of a book.
 Scenario 1: East Anglia THREE cables pulled through pre-installed ducts; or


 Scenario 2: cables for East Anglia THREE installed in new trenches (which would need to be dug as part of the installation), with additional ducts installed in which cables for the future East Anglia FOUR project could be pulled through at a later date.


42.


The sections below set out the worst case impacts associated with the onshore electrical transmission works, usually associated with Scenario 2. Full detail on impacts under both Scenarios is given in the accompanying PEIR.


43.


In either scenario, themajority of impacts identified are temporary and localised. As such, in terms of cumulative impacts, the key potential impacts would arise from the combination of the proposed East Anglia THREE project with East Anglia ONE and the proposed East Anglia FOUR project.


44. The onshore cable route and converter station locations are shown in Figure 2.


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Non-Technical Summary Page 9