PRODUCT SECTION 57
businesses, with the need to adapt Barratt’s existing housing models to incorporate the new system. The erection process took just nine days, with only five men on site. The trial was one of the smallest jobs the
company has completed in its 16-year history, but by successfully demonstrating how a supply chain can be adapted to suit a much faster, safer and more cost-effective method of building, it will potentially be its most significant.
OPPORTUNITIES In 2015 The Housing Forum issued a report, More Homes Through Manufacture, exploring how modern methods of construction could deliver more, better quality homes. In his closing remarks, Working Group chair Jim Martin commented on the numerous advantages OSM can bring to housebuilding in the UK, including the “Improved energy performance of buildings through enhanced specification and controlled factory processes.” The opportunities presented by OSM are
vast, and with proper integration into the housebuilding supply chain, could go a significant way to towards reducing the UK’s critical housing shortage.
Robert Clark is head of business development at Fusion Building Systems
Enq. 187
HBDONLINE.CO.UK Enq. 188
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60