follows that the type of vessel needed to access the windfarms differs greatly from site to site. “Importantly, operators will strive to minimise the cost of transportation and the amount of travel time that impacts on the working day.” The second factor affecting choice of vessel is the maintenance model undertaken by operators. Emergency repairs apart, the maintenance model can vary from a daily operation to block maintenance, either of which can involve technicians on site for prolonged periods. Efficient maintenance for turbines which are further offshore will be enhanced by larger accommodation vessels; the management team at the Dudgeon Offshore Windfarm has chosen to use an SOV (Support Offshore Vessel) and over the next few years the industry will doubtless be very interested to hear of its experiences.


VESSEL OF CHOICE


There is a growing number of companies contracting vessels to the UK offshore windfarm industry. Tidal Transit, based in North Norfolk, was established in 2010 specifically to provide purpose-designed Personnel Transfer Vessels (PTVs) to enable offshore windfarm developers and operators to transport technicians, tools and equipment to their places of work quickly and easily on a daily basis. Its fleet of vessels, which can accommodate 12 passengers and a crew of 4 in comfort, all have a fully equipped galley, comfortable beds, bathrooms and internet access, and can stay at sea for several days at a time as recent trips to the Dogger Bank met- mast recently proved. Since the company took delivery of its first PTV in 2011, its vessels have been in constant demand.


GAME CHANGER


Conscious that ‘one size doesn’t always fit all’ Tidal Transit came to the conclusion that a larger, faster vessel capable of reaching the more distant sites quickly and efficiently was likely to be of appeal to some windfarm operators.


the site from the windfarm base, and the model of turbine maintenance used – and is becoming ever more selective. Leo Hambro, the Commercial Director


of Tidal Transit explains: “With windfarms situated at varying distance from the UK coast, from just 1.6 kilometres (Blyth Offshore) to 23 kilometres (Greater Gabbard), and the development of Dudgeon at 32 kilometres offshore and the Dogger Bank development even further out to sea in the pipeline, it


“With this mind, we starting working with Norwegian ship builder Umoe Mondal , and in late January 2016 we became the ship operator for the WaveCraft vessel, Umoe Firmus,” commented Leo. “For a number of offshore windfarms, we firmly believe this could be a ‘game changing’ vessel.”


A NEW GENERATION


The WaveCraft is a next generation Surface Effect Ship (SES) with a small draught created by air cushions between its twin hulls. These provide the vessel


Russ Hill, Marine and Logistics Manager at the Sheringham Shoal Offshore Windfarm commented: “We are very proud to have been the first UK offshore windfarm to charter a WaveCraft vessel, and have been impressed by its capabilities. As a vessel that can operate successfully in rough weather conditions and high sea-states, it provides an ideal solution where a windfarm’s O&M model dictates that turbine technicians go offshore every day.”


Tidal Transit SCAN/CLICK SCAN/CLICK


O&M VESSELS


with easy access to most ports, a high speed of 40 knots and a low fuel consumption that gives it a range of over 700 nautical miles. An added advantage of the WaveCraft is that management of the air cushions allows smoother and safer transfer from vessel to turbine in wave heights of up to 2.5 metres, giving technicians access to their place of work in what might otherwise be an impossibly dangerous situation. Leo further explained “Different situations call for different solutions, and we acknowledge the need for diverse vessels within the offshore wind energy industry. We are therefore operating Umoe Firmus alongside our existing fleet of PTVs.”


Umoe Firmus has recently completed its first 6 month charter contract with Statkraft at Sheringham Shoal Offshore Windfarm, and Leo Hambro is confident that it will be playing an integral role in the development and operation of offshore windfarms for many years to come. “Our plans for the development and growth of Tidal Transit will ensure that we are always able to offer the right vessel for the job.” Leo added.


THE CHOICE OF VESSELS


TO SUPPORT O&M IS A KEY DECISION FOR ALL OFFSHORE WINDFARM BUSINESSES


SHERINGHAM SHOAL OFFSHORE WINDFARM


MORE INFO


PLAY VIDEO


www.windenergynetwork.co.uk


61


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82