This page contains a Flash digital edition of a book.
50 heating & renewable energy


Ubbink solar in-roof mounting system meets PV requirements for council bungalows


Cambridgeshire council at Sawston & Duxford. The project was carried out for South


U


Cambridgeshire District Council, by Foster Renewable Energies Ltd, of Wisbech, following a successful trial installation on one of the bun- galows on the site. James West of Foster Renewable Energies,


said: “The planners at South Cambridgeshire DC had expressed an interest in an in-roof type mounting for the bungalows – and we were able to show examples of previous similar projects we had undertaken using the Ubbink mounting system.”


Low profile installation


The Ubbink in-roof mounting system ensures an attractive low profile installation that blends into the roof without detracting from the character or architectural integrity of the building. James West continued: “We like the system as


it can be installed on the majority of roof cover- ings without any component changes. Modules can be installed portrait or landscape, with design and delivery all within our desired time frame. Ubbink also offers good site support if needed. Having installed over 100 Ubbink in-roof PV systems to date, with excellent service from Ubbink, we would not look anywhere else for this type of project.” All the bungalows on the site are the


‘Hawksley’ type prefabricated bungalows developed in the immediate post-WW2 period to provide much needed housing commissioned by the Ministry of Works in the late 1940s and 1950s.


Helping combat fuel poverty


The solar PV arrays formed part of a refurbish- ment programme at the site and were specified as


part of a scheme to combat fuel poverty in the Cambridgeshire area. Lightweight coated steel tiles had been speci-


fied to provide an attractive and cost-effective roofing on the bungalows. The system does not sit as flush as a typical Ubbink in-roof system, due to the Decra shallow profile, however still gives an aesthetically pleasing finish to the roof.


Aesthetics and practicality combined


The Ubbink in-roof system allowed a low-profile mounting solution for the modules – an impor- tant aesthetic consideration as the roof areas on the single storey buildings are very visible at ground level. Les Lazell of South Cambridgeshire District


Council said: “With a project of this kind there are many factors to take into account. We were keen to minimise the visual impact of the PV


arrays, but also wanted a practical and fully compliant solution, hence the decision to trial the system before rolling it out to all the properties. The trial was extremely successful and we are delighted that the project has now been com- pleted within budget and timescale.” Suitable for most pitched roofs from 15° to


70°, the Ubbink Solar in-roof system is designed for mounting and integrating most sizes and types of photovoltaic (PV) modules with tiled or slate roofs. The characteristic uplift resistance of the system as tested at the BRE, with two rails and five mounting blocks per rail, is 1759.5Pa. On new roofs, the Ubbink Solar In-Roof


system reduces cost as tiles or slates are not re- quired below the PV array. The system is supplied with a unique in-roof


waterproofing roll, which is laid across the battens and fixed before the fixing rails are fitted. Flashings and soaker details can be fabricated using Ubbink’s non-lead Ubiflex flashing material. This method was used by the Foster Renewables installation teams at Sawston and Duxford. Ubiflex gives the appearance of tradi- tional building materials like lead, but is lighter, completely non-toxic and up to 50 per cent quicker to install than lead. The Ubbink in-roof mounting system is guar-


anteed for 10 years, providing installation has been carried out correctly.


01604 433000 www.ubbink.co.uk


respond online at www.hbdonline.co.uk Enq. 184


bbink’s in-roof solar mounting system has been used on 37 bungalows for a sheltered housing scheme with South


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68