This page contains a Flash digital edition of a book.
appointments & news; air conditioning & ventilation 27


SE Controls gets switched on with Bristol’s Electricity House contract


Bristol’s iconic Electricity House building, has been awarded to a leading smoke and natural ven- tilation systems company, SE Controls. Originally designed by acclaimed architect Sir


A


Giles Gilbert Scott in the 1930s, the six-storey Grade II listed building is being converted into 85 luxury city centre apartments, while ensuring that many of the original design features are re- instated to enhance its art deco style. Electricity House’s main atrium is at the heart


of the SE Controls solution, as the smoke venti- lation system is designed to vent smoke from the atrium in the event of a fire to ensure escape routes are kept clear. To achieve this, SE Controls is designing,


installing and commissioning the system, which comprises 37 SHEVTEC® automatically controlled louvres that are manufactured and


key contract to provide an advanced smoke ventilation system to Crest Nicholson Homes’ redevelopment of


tested in accordance with BS EN 12101: 2. The SHEVTEC® louvres also incorporate ‘fall protection’ to increase safety, as well as using IP rated external motors, which are essential to allow easy access for future maintenance. In addition, 21 low level air inlet louvres and


linear door actuators also form part of the system, all of which are controlled by a series of OS2 con- trol panels with integral battery back up and fully compliant with the relevant sections of the BS EN 12010 standard. Martin Oates, SE Controls’ Commercial


Director, commented: “Electricity House is a landmark building designed by a giant of British architecture, so we’re naturally delighted to be involved in the project and look forward to its completion, which is scheduled for later this year.” He added: “Smoke control and fire safety is not


only a core part of our business, but also an area we’re very actively involved with via organisations


such as the Smoke Control Association, FIRAS and British Standards, to ensure that design, manufacturing, installation and maintenance standards are constantly being maintained. Although this is important for the industry, the real benefit is for residents who rely on systems for failsafe performance, if a fire should occur.”


01543 443060 www.secontrols.com Enq. 112


Enq. 113 respond online at www.hbdonline.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68