Worthing Pier
Following a crack detection survey by Metalock to the cast iron columns of the pier, originally constructed in 1862, Worthing Borough Council commissioned the company to repair the columns under the Southern Pavilion which had been damaged by years of corrosion and erosion.
Conducted with the columns in position, this operation required only 82 man days to complete.
Right: Photograph by Robert Luff
Head Ashby & Co, Name plate
Historical Name Plate suffers damage and is repaired by the Metalock process thus retaining its originality.