Chetwynd Bridge
Following an assessment by Metalock engineers of the grade 11 Star listed cast iron Chetwynd bridge in Staffordshire that had developed fractures, it was decided that the company’s cold repair process could provide an effective and long lasting repair.
Seventy four metres of cracks were repaired without dismantling the bridge, taking three months to complete.
Right: Photograph by Bs0u10e01 Northumberland Bridge
Metalock Engineers undertaking repairs to cast iron Column supporting a river bridge in Northumberland.