PROHEAT |
www.proheat.com Te company’s diesel-powered school bus pre-heating solution for cold weather starting becomes a part of the school bus heating system and is designed to reduce both fuel costs and emissions, according to Proheat. Te X45 offers 45,000 BTUs of heating power and features an onboard display panel that indicates the heater status and an integrated coolant pump. It offers flexible mounting options and complies with FMVSS 301 S5.5 and S5.6. Comes with a
two-year warranty.
RUD CHAIN |
www.rudchain.com Te ROTOGRIP® automatic snow chain has been specially designed for buses and vehicles that must be able to travel during hazardous winter weather. With an adjustable mounting system and unique chain wheel types, the ROTOGRIP provides excellent traction, even at low speeds of 3 to 4 mph, and works in forward and reverse. Bus
drivers can utilize ROTOGRIP with just the flip of a switch.
WEBASTO |
www.webasto-us.com Introduced in 1996, the Scholastic heater has been designed and manufactured exclusively for a North American school bus. Te CARB-approved heating system is proven to reduce both idle time and tail pipe emissions. It also ensures a comfortable environment for bus drivers and students, increases safety by providing defrosting and defogging of windows, preheats engines without the use of costly electrical systems and helps extends engine life by reduces wear-and- tear of key engine components, such as starters.
Certifi ed Seat Covers and Foam | Car Seats | Evacuation and Fire Blankets
Distributors For: E-Z-ON: Safety Vests, Cam Harnesses BESI: Pro Tech lll, Universal Vest, Over the Shoulder Harnesses SURE-LOK Q’STRAINT
3 POINT/INTEGRATED SCHOOL BUS SEATS Product: Safeguard Star
1.800.543.0575 |
www.ewss.org | 10939B Reed Hartman Hwy. • Cincinnati, OH 45242 See Us At Booth # 800
60 School Transportation News Magazine October 2012
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84