This page contains a Flash digital edition of a book.
14 STORA ENSO XXXX 


plant for the city of Colonia, an  Carmelo, along with potable water and sewage treatment plants in  Said Alexandre Nicolini, Senior  and Supply Chain at Stora Enso Biomaterials: “As a result of the technology put together for the Montes del Plata mill and the sustainable forestry base, our product has high sustainability  “In terms of the product


 our wood mix and bleaching sequence, and looking at the test results already conducted, Stora Enso Perform Plus has superior  Therefore, it is well-suited for   “Stora Enso Perform Plus will


    pulp producer that can meet our customers’ needs in many 


Pulp Paper & Logistics


All technical personnel working


 been trained by Montes del Plata     aspects was the hiring of high- school graduates who were keen  the local area some 26 young


trainees who had no experience of the industry were coached in basic sciences and in the physical aspects of the mill, and are now  Training sessions were also held throughout the forestry  64,000 training hours in forestry  than 100 operators the Montes del Plata nursery with more than 400    


   700 workers were trained in  through courses held during their work schedule, which counted as     


training sessions and daily monitoring, safety is at the core of Montes del Plata’s working 


September/October 2014


   is the cornerstone of working   compromises at Montes del Plata  


  cellulose pulp from the Montes del Plata mill was loaded into  Punta Pereira Port Terminal on 2 July for shipment to a 


When the mill begins its    Pulp is packed in two-tonne


 bundles and transported on trucks the stockpile hold to the  There they are loaded 13 at   


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36