14 STORA ENSO XXXX
plant for the city of Colonia, an Carmelo, along with potable water and sewage treatment plants in Said Alexandre Nicolini, Senior and Supply Chain at Stora Enso Biomaterials: “As a result of the technology put together for the Montes del Plata mill and the sustainable forestry base, our product has high sustainability “In terms of the product
our wood mix and bleaching sequence, and looking at the test results already conducted, Stora Enso Perform Plus has superior Therefore, it is well-suited for “Stora Enso Perform Plus will
pulp producer that can meet our customers’ needs in many
Pulp Paper & Logistics
All technical personnel working
been trained by Montes del Plata aspects was the hiring of high- school graduates who were keen the local area some 26 young
trainees who had no experience of the industry were coached in basic sciences and in the physical aspects of the mill, and are now Training sessions were also held throughout the forestry 64,000 training hours in forestry than 100 operators the Montes del Plata nursery with more than 400
700 workers were trained in through courses held during their work schedule, which counted as
training sessions and daily monitoring, safety is at the core of Montes del Plata’s working
September/October 2014
is the cornerstone of working compromises at Montes del Plata
cellulose pulp from the Montes del Plata mill was loaded into Punta Pereira Port Terminal on 2 July for shipment to a
When the mill begins its Pulp is packed in two-tonne
bundles and transported on trucks the stockpile hold to the There they are loaded 13 at
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36