Housing values have surged from the recession and devaluation of the mid-1980's to values that once again place the homeowners living in Cedar Falls in an advantageous market position. This market growth is a credit to businesses, the school system, utilities, and quality of City services in Cedar Falls. Each entity has worked together to strengthen the local economy, create jobs, and improve Cedar Falls' quality of life.


MAJOR INITIATIVES


Disinfection Project: ln August 2009, the Public Works department presented to council information on an Ultraviolet Light (UV) Alternatives Evaluation Workshop. This is a process to treat bacteria at the Water Reclamation Facility. The Environmental Protection Agency (EPA) has directed a new standard of treatment. The advantage of UV over other disinfectants is it can inactivate hard to control organisms, such as E.coli, without chemical additions to the final product and without producing a harmful disinfection by-product. Using UV is a better and safer way to disinfect and there are no residuals.


ln FY11, the Public Works department solicited bids for the construction of the Water Reclamation Facility UV


Disinfection and Biosolids Handling Facilities lmprovements Project (Disinfection Project). Construction of the project began in FY12 and a majority of the construction has occurred during FY13. Completion is expected in FY14. The total project cost will be approximately 921.8 million.


This project will have a significant impact on the City's sewer fund. The City Council did approve a So/o increase on sewer rates each year for five years beginning in FY12. The council also decided not to finance the project in a traditional way of selling sewer bonds. lnstead the City has opted to self-finance the project. Cash reserves from the City's Capital lmprovements Fund and Hospital Fund havefinanced the project. Through June 30,2013, these funds have foaned the sewer fund $15.9 million. Self-financing has allowed these funds to earn interest at a rate greater than earnings on traditional investments and the sewer fund benefits by paying interest costs lower than bond rates.


Bluff Street Lift Station: ln 1962, the Bluff Street Lift Station was constructed below the 1Oo-year flood elevation. During the Flood of 2008, the entire basement (pump room) filled with water and the control room had five feet of standing water in it. Due to its location, the station was not accessible for several days and out of service for about two weeks because of the significant damage to the mechanical equipment in the station as well as to the backup generator. Because of the dry well/wet well configuration of the station, conventional flood protection was not practical, therefore the City applied for a Community Development Grant (CDBG) Disaster Recovery Grant to construct the new station at a higher elevation and that is not subject to flooding and is completely accessible in a high water event.


ln FY10, design on the new lift station started and the Public Works Department solicited bids for the New Bluff Street Lift Station project. Construction began in FY12 and continued in FY13. Completion will occur in FY14. The total project cost will be approximately $Z.g million. The CDBG grant will fund $3.g million of the cost. The remaining cost will be financed with sewer bonds and self-financing options. Sewer rates increases described above also were needed to help finance this project as well.


3


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160