This page contains a Flash digital edition of a book.
The latest news and views from SAPCA


Specific requirements for the playing performance of a sports surface may need to adhere to governing body standards


It takes five minutes and 10 steps to find out how to ensure your sports construction project is a success


TAKE FIVE!


1. Use appropriate professional advice


Depending on the scale of the sports facility project proposed, there are a large number of specialist advisers who might be involved dur- ing the different stages of development. When selecting professional consultants it is essential to check that they have relevant experience, and often a team approach is re- quired to ensure that specific aspects – such


as the performance of the playing surface, or the precise design and standard of sports lighting – are catered for properly. SAPCA’s Professional Services Group in- cludes a variety of independent specialists involved in sports facility projects, details of which can be found at www.sapca.org.uk.


2. Investigate the site A full understanding of the nature of the proposed site is vital as this provides the basis on which the facility will be designed. It is generally better to employ an inde- pendent consultant to undertake the site investigation. In this way the client can better control the quality and consistency of the information and giving the results to the contractors invited to tender ensures that everyone has the same report.


Funding bodies will usually include the cost of the site investigation within the eligible project costs for financial support.


Go for a team approach in the selection of professional consultants to undertake the site investigation


Issue 2 2012 © cybertrek 2012


3. Get the product right Apart from any other aspect of the project, the choice of sports surface itself is compli- cated, with such a wide variety of products on offer these days.


It’s important to establish which sports are


to be played and to what level, the likely usage pattern and how the facility will be managed and maintained. The maintenance and replace- ment costs should be identified, as well as the longevity of a surface, which together will help to determine the necessary annual sinking fund provision.


4. Make sure you have a comprehensive specification There are two main options – either pro- ducing a full specification against which contractors can be invited to tender, or a ‘design and build’ approach, where contractors are required to provide and price their own design solutions.


The project specification may need to include specific requirements for the play- ing performance of a sports surface, such as compliance with the particular standards of a sports governing body.


Read Sports Management online sportsmanagement.co.uk/digital 71


PIC: ©SHUTTERSTOCK.COM/TOMASZ BIDERMANN


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84