A number of canals and lakes have already been built ...
will definitely improve from practice on this course.
As with the existing nine- hole course, all the greens will be sown with a mixture of grasses using Barenbrug’s Bar Platinum seed mixture.
· 30% Bargold Perennial ryegrass
· 25% Barcrown Slender creping red fescue
· 25% Barpearl Slender creeping red fescue
· 10% Bargreen Chewings fescue
· 10% Heriot Browntop bent. The tees have been made as
large as possible to cope with the wear and tear. They have been sown with a ryegrass seed mixture, with some smooth stalk meadow grass sown in for additional stability.
With nearly all the greens and tees seeded most of the remaining work is finishing off small bunker placements and completing the water features. Barrie and Richard are confident that the course will be open for play by late Spring. The soils soon warm up in the Spring initiating early growth and thus
making grass establishment and growth at Woodside very good.
A watering system has also been installed for the greens and tees which will be a great asset for maintaining the new nine-hole academy course. It is amazing what can be achieved when all the resources are collectively available and the window of opportunity prevails.
· Woodside will be able to offer another challenging pay and play facility for its members and customers.
· The Directors and staff have undertaken the experience of a lifetime having built their very own golf course.
· Barrie will have completed another milestone in his career of Golf Course Construction
The golf course Director and the company Directors hope this new facility will improve the golfing experience at Woodside. Above all they want to encourage both the novice and experienced players to improve their golfing skills by tackling the challenges and intricate
designs the course will offer when it opens in 2006.
construction team at the new academy course
The ‘in-h
“It’s amazing what can be achieved when all the resources are collectively available ”
house’
Designed to feature a number of hazards - bunkers, water, trees
... constructed by simple excavation, modelling and laying out membranes
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76