bcd12_services 28/1/10 16:28 Page 4
Bespoke Design Service Provides Solutions Total Home Environment do More with Air
Polypipe Ventilation Total Home
has a full bespoke Environment (T.H.E)
design and will be exhibiting its
manufacturing service range of Beam central
based here in the UK. vacuum systems and
Polypipe Ventilation’s Genvex heat recovery
team of highly and heat pump
qualified, experienced ventilation systems at
engineers are on hand this year’s Ecobuild, at
to provide a bespoke Stand 1540, as well as
design service for just showcasing the new
such circumstances Genvex Premium
and the company’s range. The new
advanced fabrication Premium appliance
shop and combines heat
manufacturing expertise ensures the products are made to the highest recovery ventilation and heat pump technology to efficiently harness energy
standards. Bespoke products can range from a simple fabricated assembly from outgoing air, generating as much as six times the heat energy as the
based on standard product through to more complex designs using different power it consumes. Genvex has 35 years experience in heat recovery
types of plastics, finishes, colours or manufacturing methods. ventilation and air-source heat pumps.
...searchable archive at
www.buildingconstructiondesign.eu ...searchable archive at
www.buildingconstructiondesign.eu
Vortice Invests in CAD System Upgrade Is Your Cable Up to the Mark?
Vortice has invested a further £16,000
in upgrading its CAD systems for its
technical design office in Burton on
Trent. This investment which builds
upon an upgrade undertaken 12
months ago, will improve the turnaround
time for the company’s designs and
quotations, particularly for System 4
projects and ductwork layouts through
properties. Ian Davis, Technical Draka is showing an industry lead by spearheading another campaign aimed
Manager at Vortice said: “Increased at highlighting the dangers of installing electrical cables that fail to comply
demand, particularly for technical with the required regulatory standards. This time the company is focusing
drawings for our family of energy much-needed attention on the absence of cable marking, without which there
efficient products has set a requirement is no means of establishing the cable’s authenticity. In the absence of such
to upgrade our CAD systems once marking there is every probability that the quality and performance of the
more. We look forward to being able to cable is highly suspect and is from a disreputable supplier. Under the banner:
further improve our already fast turnarounds to customers.” “If it’s not marked, it’s not worth it”, the campaign is aimed primarily at
...searchable archive at
www.buildingconstructiondesign.eu installers but, Draka believes, it is a problem that should also concern
Tel: 01283 492949 wholesalers and distributors, specifiers and building control officers.
www.vortice.ltd.uk ...searchable archive at
www.buildingconstructiondesign.eu
4
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28