This page contains a Flash digital edition of a book.
22 | TOP REFURBISHMENTS | NEWS AND CURRENT AF FAIRS Read a related story: click here


AN AMBITIOUS PROGRAMME of re-design and refurbishment costing £4.5m is nearing completion at Buckinghamshire New University in readiness for the new academic year. The South Wing of the campus


in Queen Alexandra Road, High Wycombe, which was originally built in the 1960s, has been completely re-modelled to offer a state-of-the-art facility with both dedicated and bespoke learning and teaching areas as well as more informal space for students to enjoy. In response to student feedback


wider than average corridors have been decked out with seating and power/data points to create informal areas designed to double up as ‘working on the go’ or social space. To create the right ambience students have been given free choice of colour for feature walls in the areas they will use the most, such as teaching rooms and informal social spaces. To accommodate growth within


the Faculty of Society & Health, which is primarily based at the University’s Uxbridge campus, an advanced clinical skills laboratory with an eight-bay hospital ward has been built. The new skills area will be kited out with the latest in interactive medical and teaching aids, including a range of simulation mannequins for both child and adult nursing fields. Provision has also been made


for the future development of an additional fully functional simulation suite consisting of an operating theatre and recovery room. This will match the facility already available at the Uxbridge campus and will therefore double the capacity for students’ interactive learning in a simulated hospital seting. The refurbished building also


ABOVE: The South Wing of the campus has been completely re- modelled


offers bespoke office space for academic staff as well as a ‘drop in and drop out’ hot spot to facilitate flexible working arrangements for staff. Teaching space has also been increased with five new teaching rooms with sliding partitions to accommodate variable class sizes. In terms of reducing the


University’s carbon footprint, the building’s old single-glazed timber-framed windows have been replaced with metal curtain walling and double-glazed windows with special reflective glass which is highly insulated to enhance energy saving and reduce thermal heat gains. A 50 kW solar panel array forms part of the new roof structure which will generate 50,000 kW of electricity


per annum. This measure, coupled with the building’s new and reinsulated felted roof, will play a key part in the University’s pro-active carbon reduction programme, as will the air source heat pump which efficiently provides both cooling and heating systems within this building. The two solar panel arrays on


South Wing and sister building ‘Timberlake’ will together produce enough energy to power, for a full year, another University building known as ‘Owen Harris’. This block, which stands at the rear of the campus, covers 1.800 sq m and houses 80 staff who work in key business functions including HR, Training, Communications, Marketing and Admissions as well as the Universities International Office and two large lecture theatres. Deputy Vice-Chancellor


Professor Derek Godfrey said: “We are really excited at the prospect of unveiling our newly refurbished state-of-the-art South Wing facility at the beginning of the new academic year. Not only will students and staff be delighted by the external and interior re- development, but budgets have been carefully managed over the course of the eight-month building project to ensure there was enough money left to fund even more development. “The second stage, due


for completion at the end of December, will see the ground- floor transformed into a flexible multifunctional area which will be used to showcase events for students’ work as well as host open days for prospective Bucks students. This area will also have direct access from the Gateway concourse which will provide additional connectivity for our University community.” UB


W: www.universitybusiness.co.uk | T: @UB_UK


BUCKS SET TO UNVEIL £4.5M DEVELOPMENT Major re-design and refurbishment project is nearing completion at Buckinghamshire New University


Images © Dave Marriot Photography


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82