Time and cost benefits with complete piping solution


Thomas Rüdiger and Frank Wiele outline the benefits of welding-free flange connectors.


maintenance and operating expenses and the demand for compact and space-saving equipment. Against this background, for the design of


T


Figs. 1. and 2. The Parflange F37 System.


hydraulic systems Parker Hannifin now offers with its Piping Solutions Programme welding-free flange connectors; it offers the user substantial savings potential along with a service and advisory package. Te Parflange F37 system is used for pipes with an external diameter of 16mm to 273mm (½ inch to 10 inch flange). It is suitable for pipe wall thinckness of up to 9mm and pressure upto 420 bar. Te special orbital flaring process is very convincing when compared with conventional welding because of its significantly fewer work operations. Te system is based on tried and trusted Parflange technology, producing a high strength flared connection having a rolled, consolidated pipe end surface. It positively locks the pipes together.


he development of hydraulics is nowadays characterised by increasing system pressures and safety requirements, continuing pressure to make savings in installation,


pipes are being used because the zinc layer is not affected by flaring. No noxious gases are created either during flaring or assembly and there is no risk of fire or explosion. Tis means that deployment in locations with high safety requirements, eg offshore platforms, is perfectly possible. Te Parflange ECO 170 is part of the Parflange F37 system and produces fold-free, absolutely smooth flares on site. Te remarkably short cycle time - totalling only one to two minutes for the complete machining operation, depending on the pipe characteristics - makes the substantial productivity gain compared with welded line systems very clear.


Whether for original build or the modernisation of existing equipment - besides trusted mature technology, Parker Hannifin with its Piping Solutions Programme offers customers all-round support from the very first advisory discussion through to design, pre-assembly, supply and installation of the pipe and flange components. One and the same Parker support person is


responsible for the correct execution of each individual stage. For the customer, this means faster operation of the complete project. Also, the user can relieve his own team of the


Te stress corrosion cracking caused by welding cannot occur, which of course increases the service life of the piping system. Since there is no external heat supply, Parflange technology saves energy. Tere is no requirement for degreasers or anti- corrosion agents, or for subsequent pipe cleaning. Re-galvanising is not required when galvanised


project work and use such free capacity for other tasks. ●


Enter 53 or ✔ at www.engineerlive.com/iog


Thomas Rüdiger and Frank Wiele are with Parker Hannifin Manufacturing Germany GmbH & Co KG - Sitz, Bielefeld, Germany. www.parker.com


www.engineerlive.com 53


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86