Technical Frame


Tips of the Trade Why we specified...


certified to a recognised sustainability certification scheme such as Eco- Reinforcement and CARES (UK Certification Authority for Reinforcing Steels) and from a CARES-approved supplier/fabricator. This will provide information on the reinforcement’s carbon footprint and an assurance of its quality.


Working with concrete reinforcement 01


is involved at the earliest possible stage to realise cost efficiencies at both design and construction stages through simplified detailing, easier fixing, reduced on-site labour requirements and reduced site waste.


02


Glulam timber beams from B&K Structures Peppa Pig indoor play building Paultons Family Theme Park, New Forest, Hampshire Harry Stafford, project architect, HPW Partnership


Peppa Pig World features around 20 rides themed on the popular children’s TV character and the indoor play area was designed to enable the park’s owner, Paultons, to extend visiting periods into the wet and cold weather. Grassy hills feature extensively in the


TV show and are mirrored in the smooth curved green roof of the building, which encloses a cafe, shop, kitchen, public toilets and the indoor play area, spread across a 9,000ft2


ground floor, plus two


mezzanine floors above. The roof shape was created using eight cross-laminated glulam timbers, at 7.1m centres on the perimeter steel columns. The glulams were manufactured to form two different curvatures: a standard geometrical curve at either end of the building; and a bespoke curve over the central play area, which kicks up to create


Product news


THE TECHNOMIX mobile wet mix concrete batching plant is capable of producing 50m3


of wet concrete


an hour. The plant can be operational within a few hours thanks to a “self-


installing” mixer that does not require a crane for assembly. On site, the mixer, support frame and external platforms are automatically lifted into position using a system of hydraulics, while the aggregate elevator belt simply folds into place from inside the hopper. It is managed via a touch-screen panel, which allows users to create and store formulas and create batching reports. www.utranazz.com


34 | APRIL 2012 | CONSTRUCTION MANAGER


U-ROOF is a fast-to-erect and lightweight steel roofing system comprising u-shaped cold rolled galvanised steel beams that slot


together like Meccano. Suitable for any


light commercial property or domestic structure, the flat-packed system is bespoke-designed for each project and can be fitted together much faster than traditional timber frames or heavy hot-rolled sections, according to the manufacturer. The roof is particularly effective when used in conjunction with rigid urethane insulation material, producing u-values as low as 0.09W/m2. www.u-roof.com


DESIGNED for smaller building


projects that need vertical building access, Alimak Hek’s TPL 500 and TPL 300 rack and pinion lightweight material hoists can be converted into


transport platforms by fitting an additional roof section. The hoists can lift 500kg and 300kg respectively and are quick to erect and dismantle. A compact base frame allows the hoists to be manoeuvred into very narrow spaces, platforms are interchangeable with ramp or gate options, and a perforated steel plate floor provides a rigid anti-slip surface for men and materials. www.alimakhek.com


higher eaves where windows have been inserted. The windows provide children with an exciting glimpse of the 6m-high climbing frame inside as they approach. The glulams are made from Austrian


whitewood and spruce and had to be very strong to support long uninterrupted spans of up to 19.5m and the weight of the green roof above, which exerts forces of around 2kN/m2


.


We chose B&K Structures to supply the timbers because it specialises in glulam and offered the most competitive price for this type of building. We initially considered using crenelated steel beams, which would have been cheaper, but opted for timber to avoid an industrial warehouse type aesthetic. Timber is also very thermally efficient, which means less heat loss through the fabric than steel and no cold bridges. Paultons is keen to reduce its carbon footprint — its in-house construction team super-insulated the building well beyond Building Regs — and glulam has a low embodied energy.


is the joint responsibility of the customer, haulier and supplier. Make sure that there is agreement between all parties over the implementation of a safe delivery plan. The site should carry out risk assessment for the unloading operations and prepare a basic lifting plan in accordance with BS7121.


03


reinforcement fabric, but they are provided as a handle and should not be used for lifting as there is a risk of injury if the bundle tie fails during a lift. If bundles of reinforcement are to be moved around the site after delivery, then plan appropriately using risk assessments, correct equipment and personnel.


04


the supplier aware of specific delivery requirements. This includes notifying the reinforcement supplier of any restrictions such as no articulated vehicles, no deliveries around school times.


05


By Graham Mackenzie, chairman of the British Association of Reinforcement


Warn suppliers of restricted access It is the site’s responsibility to make


Handle bundle ties with care Bundle ties hold together sheets of


Ensure safe delivery The safe delivery of reinforcement


Involve the fabricator early Ensure the reinforcement fabricator


Make the right choice Choose reinforcement that is


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56