Process guide helps you manage every step.
A new server room build is a major project with an incredible number of items to plan, design, acquire, and implement. Bottom line: It’s essential that every step is accounted for and executed at the appropriate time, with each step providing input to the subsequent steps that depend on it. The System Specification and Project Manual process map and data gathering tools helps you ensure nothing is overlooked.
Standardized project process PHASES
Prepare Commit to project
Assess Needs
Develop Concept
Purchase order submitted
Initialize Project
Establish
Configure Solution
Finalize Proposal
Purchase Order
Create
Design Acquire Implement PROJECT MANAGEMENT
Equipment delivered
Shipment Site Requirements Coordination Project complete Assembly
Installation by Subcontractors
Start-up Network Integration
Orientation and Training
Whole-system approach optimizes functionality, reduces cost.
The System Specification and Project Manual describes the essential requirements of performance and interoperability, plus best practices that will help you create a efficient system.
Infrastructure Physical
The heart of the manual is the key construction specifications, listed as a series of line items addressing every construction aspect. They are performance-based, rather than product- based, which means they are not specific to APC by Schneider Electric products – any manufacturer could make products consistent with these specifications.
Fire
Power
Security
E Cooling
Racks
M
A
N
A
G
E
M
E
N
T
S
E
R
V
I
C
S
STEPS
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32