This page contains a Flash digital edition of a book.
EARLY CLOSURE CLEAN EXIT


WSP’s advanced site closure programme provides clients with a fresh opportunity to use our cutting edge remediation “know how” to close remediation programmes early and exit from environmental liability.


Traditional remediation programmes are driven by environmental protection policies and standards that are often unachievable without significant cost and environmental impact.. As a result, projects frequently fall short of their original objectives, leaving stakeholders in the dark on both remediation costs and timescales.


A Fresh Approach Our Advanced Site Closure Programme delivers a comprehensive technical solution to remediation liability management providing clients with an opportunity for early exit from remediation liability by bringing together in a coherent offering the following remediation approaches:


Remediation Footprinting and Sustainability Appraisal: Now a useful step in considering the wider impacts of remediation programmes; ensuring remedial works are both necessary and sympathetic to the wider environment and supporting decisions for early closure.


Site Diagnostics: Using innovative tools to characterise site contamination plumes and develop lines of evidence to design, manage and optimise in-situ remediation programmes.


In Situ Remediation Technologies: Using a wide range of rapid and cost-effective techniques informed by site diagnostics programmes to recover, degrade and destroy pollutants.


Monitored Natural Attenuation: A remediation approach based on understanding, quantitatively documenting and demonstrating that naturally occurring processes are reducing contaminant loads at a site and at a rate suitable to protecting receptors from hazardous contaminants.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12