Product News ecorcirc® hot water circulator
A state-of-the-art design allows the ecocirc to use 68 percent less energy than most standard pumps and can save an average family of four more than 12,000 gallons of water a year by eliminating the need to wait for the water to get hot. U s i n g only 10
watts of power, the equivalent of a small
night l ight , the ecocirc can save a
energy costs a year. ITT Bell & Gossett.
Circle 100 on Reader Reply Form on page 85
homeowner hundreds of dollars in
Hydronic furnace
Hydronic furnace design works in con- junction with the Rinnai® tankless water heating system to efficiently heat the entire home, and features Electronically Commu t a t e d Motor (ECM) technology. This ultra-efficient brushless DC (direct current) motor operates up to 48 percent more efficiently than traditional PSC (permanent split capacitor) motors, which
translates into lower operating costs. Rinnai
Circle 101 on Reader Reply Form on page 85
The Building Information Modeling Report Continued from page 50
project. This shared ownership can often provide better costs, on time delivery and higher quality, which means a better project, has been delivered to the building owner.
Press fittings for steel pipe
FASTLOCK is a complete line of malleable iron press fittings for Schedule 10 – 40 black and galva-
and NSF 61-4 certified Cimberio Valve.
Circle 102 on Reader Reply Form on page 85
nized steel pipe. FASTLOCK fittings install quickly and easily with FAST- LOCK press jaws, which are compat- ible with most press tools on the mar- ket. There’s no need for threading dies, pipe sealants, or pipe wrenches. Available in ½" – 2" and are IAPMO
This fully-coordinated Navisworks model was used by Boston-based mechanical contractor J.C. Cannistraro for pre-fabricating the mechanical room at a laboratory facility in Cambridge, Mass. (Source: J.C. Cannistraro, LLC)
It has been said that BIM usage
reduces risk in the project. How? • There are many ways that BIM
can reduce risk. We’ll mention just a few to start the conversation. • BIM is an integrated process that
Page 86/Plumbing Engineer
vastly improves project understanding and allows for predictable outcomes. This visibility enables all project team members to stay coordinated, improve accuracy, reduce waste, and make informed decisions earlier in the process — helping to ensure the project’s success. • Using tools like the Revit BIM Portfolio and Navisworks risk is mitigated in many ways. Identifying clashes with Navisworks early on, means that you can identify errors, clashes and reduce expensive and time consuming RFIs, meaning you accept failing on the desktop and not in the field. It allows you to schedule work so that only the right personnel is on site, allows team to prefabricate MEP and reduce the number of site injuries. Using Conceptual Energy Analysis
features in Revit Architecture and Revit MEP means you can do earlier energy analysis and build a more sus- tainable design early on. • By using Revit and Navisworks models, visualizing the project
enables workers and owners know exactly what the project will look like (virtual fly throughs) and there is less risk of miscommunication, less chance of litigation. It is this accurate communication of design intent that delivers a huge benefit. What is the future of BIM? Any
new developments? Let me touch on two areas. First,
BIM has expanded beyond the focus of just buildings and now includes the civil engineering and infrastructure realm. The same principles that have improved the design and construction of buildings is now applicable for water, waste-water, power, smart grids and utilities, land development, road and highway projects. Second, the whole concept on considering the entire “building lifecycle” is now being rolled into BIM. Eighty percent of the cost of a building, over its life- time comes after the building is con- structed. This means the costs savings coming from electricity and water use, improved energy efficiency and main- tenance are significantly greater finan- cial considerations. High performance buildings are efficient buildings, delivering greater value to the owners and occupants. n
January 2011
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88