1. If water at 20°C and 1 bar gauge is heated to 60°C, what is the potential amount of released air into a system?

A 10 L/m3

B 15 L/m3 C 20 L/m3

D 25 L/m3 E 30 L/m3

2. In the article what was the main reason given for typically installing AAVs at the top of risers?

A To trap microbubbles when the system was operating B To ensure that they did not get blocked with magnetite C To provide an area of still water to allow air to rise D To capture air that naturally gravitates to high points E To reduce pitting corrosion on the valve

3. Temperature differential separators principally operate at which of these conditions?

A By providing a ‘still’ water environment at a point in the system with a higher temperature

B By providing a high system temperature and high pressure

C By allowing the temperature of the water to drop in the large vessel

D By setting up a temperature difference between the top and bottom of the large vessel

E By removing the air when the whole system cools down

4. Pressure differential separators operate by which of these methods?

A Being installed at a low pressure point in the system

B By repeatedly deaerating small samples of water by reducing the pressure

C By connecting across two points in the system to benefit from the pressure difference

D By providing a ‘still’ water environment at a point in the system with a higher pressure

E By removing air bubbles through manual operation of a vacuum pump

5. Which of these is unlikely to be true for a properly-installed dirt separator?

A They normally need operating maintenance of a few minutes each year

B They remove magnetic dirt only C They remove particles heavier than water D They operate by providing a ‘still’ water environment E They can be combined into a single unit with a deaerator

66

CIBSE Journal May 2010

Other institution

(please state)..............................................................................................

To help us develop future CPD modules, please indicate your primary job activity:

Building services engineer Mechanical engineer Electrical engineer Commissioning engineer Energy manager Facilities manager Other (please give details).................................................................

If.you.do.NOT.wish.to.receive.information.about.Spirotech,.the. sponsor.of.this.CPD,.please.tick.here:.

By entering your details above, you agree that CIBSE may contact you from time to time with information about CPD and other training or professional development programmes, and about membership of CIBSE if you are not currently a member.

Please.go.to.www.cibsejournal.com/cpd.to.complete.this. questionnaire.online..You.will.receive.notification.by.email.of. successful.completion,.which.can.then.be.used.to.validate.your. CPD.records.in.accordance.with.your.institution’s.guidance.

Alternatively,.you.can.fill.in.this.page.and.post.to:..

N Hurley, CIBSE, 222 Balham High Road, London, SW12 9BS

Name (please print)..................................................................................

Job title........................................................................................................ Organisation.............................................................................................. Address....................................................................................................... ..................................................................................................................... ..................................................................................................................... Postcode..................................................................................................... Email ...........................................................................................................

Are you a member of:

CIBSE

If so, please state your membership number

(if available)................................................................................................

www.cibsejournal.com Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76
Produced with Yudu - www.yudu.com