This page contains a Flash digital edition of a book.
Case study CIBSE award winner
Making
E
fficient Air Ltd was set the challenge of
inspecting the air conditioning system at a UK
government building to show the value of such
inspections in improving efficiency at low cost.
The building, Eland House in London, is home to the
Department of Communities and Local Government
(CLG). We found that the savings identified for the
it pay
property in effect paid for the costs of the inspection
and recommendations in a short period.
In figures, the cost of the air conditioning survey was
£3,744, and the low-cost actions taken cost £8,200.
The payback period of the actions was less than five
months, and overall savings made came to a total of
£32,642.
When we carried out the inspection, the property had
a Display Energy Certificate (which covers operational
energy efficiency) with an F rating, one grade above the
lowest grading of G. CLG was keen to test whether an
The UK government department that
air-con inspection could in effect lower energy bills,and
reduce the carbon footprint at Eland House, which
oversees the Building Regulations set
opened in 1998.
itself the task of increasing efficiency at
The building’s Energy Performance Certificate
rating (based on the design intentions) was a C,
its headquarters. Darren Bryant describes
which underlines the important differences between
how air conditioning system changes
design and actual operations when it comes to energy
efficiency. As a result of this difference, we were asked
alone enabled the property to raise its
to develop detailed recommendations for improving
energy certificate rating – a task that
the performance of the air conditioning system.
It was agreed that our objectives for the inspection
won his company the accolade of EPC
were to:
of the Year in the CIBSE Low Carbon
• Highlight operating anomalies;
• Compare the size and appropriateness of cooling
Performance Awards 2010
plant with the cooling demands of the building; >
.com
.simonweir
www
eir
W
Simon
30 CIBSE Journal February 2010 www.cibsejournal.com
CIBSEfeb10 pp30-32,34 eland.indd 30 28/1/10 16:30:38
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76