This page contains a Flash digital edition of a book.
News | EQUIPMENT


ranta 2, P.O. Box 196, FI-00531 Helsinki, Finland. Tel +358 10 709 0000 Fax +358 10 709 5700 www.wartsila.com


Ancillary equipment WME awarded


HVAC contract Wilhelmsen Marine Engineering has been awarded the contract to deliver a heating, ventilation and air conditioning (HVAC) system for a new RoPax vessel being built at Brodosplit Shipyard in Split, Croatia for Compagnie Meridionale de Navigation (CMN). Under the terms of the deal, WME will deliver


everything from system design to material and commissioning of the system. Jan Wallberg, area sales manager Europe for Wilhelmsen Callenberg Flakt says that key factors in this project were energy efficiency and the environment. WME’s capability to deliver an energy efficient solution was probably the crucial point in winning this business, he adds.


Contact Wilh. Wilhelmsen ASA, Strandveien 20, NO-1366 Lysaker, P.O.Box 33, NO-1324 Lysaker, Norway. Tel +47 67 58 40 00 Fax +47 67 58 40 80 E-mail ww@wilhelmsen.com www.wilhelmsen.com


Software Bricsys launches


latest version Bricsys nv has launched Version 10 of Bricscad, the DWG-alternative CAD platform. Bricscad V10 has a host of new features, foremost of which is eBridge. eBridge links Bricscad to Vondle, Bricsys’ “Cloud


Based” Project Collaboration suite, which will offer customers a more efficient way to view and share files online. Vondle supports up to 40 different file formats,


including DWG, AutoCAD, MS Word, MS Project and PDF. There will be no need to download the documents or have a local copy of the application and will allow large multi-megabyte files to be shared in seconds, via a web browser. Erik De Keyser, CEO of Bricsys said: “Bricscad


V10 is the perfect platform for teams. eBridge is just the start of integrating new team-collaboration


18


tools into CAD”. Besides eBridge, Bricscad V10 will offer a whole


range of performance improvements including; Smooth and fast view panning, smart selection highlighting, cycling through elements during selection, snap tracking with parallel alignment to Z-axis, gradient hatching, PDF export using plot style tables, amongst others. “Our success to date has been based on offering


DWG compatibility, a recognisable interface, real day-today-support and reasonable prices. With Bricscad V10 we hope to demonstrate that Bricsys is not just a slavish follower of DWG CAD but is one of the most innovative companies in its field,” says Eric De Keyser. Future developments of Bricsys will see the


release of a plug-in forAutoCAD and a free 144 page e-book “Bricscad for AutoCAD Users” is available online.


Contact Bricsys nv, Bellevue 5/201, 9050 Gent, Belgium. Tel + 32 9 244 01 90 Fax + 32 9 244 01 99 www.bricsys.com


Propulsion Berg wins large


Asian order Berg Propulsion has secured the first Asian reference for its Berg Azimuth Thruster (BAT), launched earlier this year, in what is also the first order to involve the product’s installation by a Chinese yard. Berg has signed a contract with Singaporean oil


and gas field support and logistics contractor Teras Offshore to deliver its largest BAT units to date, in the shape of two 2500kW (1600 rpm) output BAT 730 units, as well as two BTT 519 tunnel thrusters. Berg Propulsion Singapore Production Facilities


will deliver all units in August 2010 to CCCC Bomesc Marine Industry Co., Ltd. (Tianjin, China), for installation onboard a 13,000dwt deck cargo vessel, to work in combination with electric motors. Te vessel will be 158.0m long, 28.2m wide and 9.0m deep vessel (draught 5.6m), classed by ABS “Having already secured orders covering a survey


vessel rebuilt in Sweden, and a smaller offshore vessel to be built in Dubai, we have now moved on to the larger end of the BAT capacity scale with this order for Teras,” said Berg Propulsion Sales Director, Asia, Aloysius Hendricks. Mr Hendricks said the BAT 730 unit worked with


propellers of up to 3m in diameter. The BAT was now available in power ranges of up to 3200kW,


The Naval Architect November 2009


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68