search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
customers the freedom to design a building, with the help of in-house designers, in the style of their choice and to suit their specifi c needs. Once agreed, T e Qube team takes on the entire project, from handling planning applications and ensuring compliance with building regulations, through to providing drainage and utilities, on-site installation, testing, and the installation of furniture. Off -site construction means that time on site is


kept to a minimum, following stringent health and safety guidelines and causing as little disruption as possible when it is time to deliver and assemble. Part of the building industry has been advocating MMC for some time – rightly so, with benefi ts such as shorter build times and higher quality control, coupled with the environmental benefits; the adoption of sustainable techniques and materials help to reduce the project’s contribution to the production of CO2. Speedy construction of much-needed medical


provision highlighted the benefi ts of MMC, and Jordan Spittle is hopeful that will act as a catalyst for bringing the wider benefi ts into sharper focus. “Perceptions have to change and we need to


open people’s eyes to the possibilities of using MMC,” said Jordan. “T e possibilities are almost endless and extra space in a school or a hospital will always be utilised. A lot of our work has been with independent schools that are increasing capacity by moving to two-form year groups, so need additional space to house that additional intake. “Traditional methods of construction are not


going to disappear overnight (nor should they) but we are confi dent of the future potential of the products and services that we off er. We have the ability to work with other modular/volumetric partners, or to work with more traditional construction companies and architects to help them understand how and where they can utilise MMC as part of their wider off ering. “Our job is to raise the profi le of the sector because we know that


as attitudes change, and people see what is possible when utilising MMC, demand will rise and there will be fantastic opportunities across various sectors all over the country.”


Find out more about The Qube on 01604 785786, email jordan@theqube.co.uk or visit www.theqube.co.uk


ALL THINGS BUSINESS


21


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36