Enviroman


Marco Muia: Direct and to the point www.oaktree-environmental.co.uk


LAST month Version 7 of the CIWM/ WAMITAB Operator Competence Scheme was released, and it is of interest to site owners, operators and managers.


The document runs to 28 pages, so I’ve tried to condense it to cover what I see are the most important points (by way of the questions I really do get asked).


What are the risk tiers? Waste facilities are split into High, Medium and Low risk categories, each of which have diff erent competence requirements. The risk tier table hasn’t changed since April last year, specifi es the qualifi cations needed for all types of waste sites, and also highlights the relevant standard rules permits where applicable. For example, a non-hazardous transfer station with treatment would be medium risk, with the new operator competence award being MROC1.


What qualifi cations do I need? The current WAMITAB Operator Competence certifi cates were introduced in April 2016, and are now the main qualifi cations for waste operators. They are Regulated Qualifi cation Framework (RQF) qualifi cations obtained in the workplace i.e. using a portfolio of evidence assessed by a WAMITAB approved assessor. The portfolio is prepared using an award specifi c workbook, which is completed by the candidate and supported by work based evidence at an operational site (such as copies of operational documents, site diary, transfer notes etc: to demonstrate candidates involvement and competence). The qualifi cations are subject to internal and external quality assurance before a certifi cate can be issued by WAMITAB. Short summary guides to the qualifi cations are also available on WAMITAB’s website. The WAMITAB Level 4 Certifi cate in Waste and Resource Management is also available, and is classroom based - with written assessments showing the application of knowledge and understanding. This qualifi cation cannot


30 SHM August, 2017


be used for all sites, and typically applies to non-hazardous sites in the Medium and Low risk categories.


Low risk sites can make use of the Environmental Permit Operator’s Certifi cate (EPOC), which is a two day training course delivered by CIWM with a written test at the end which must be passed to obtain the certifi cate.


The EPOC can be used to obtain a grace period to obtain a competence certifi cate for those operating a newly permitted site.


How do I maintain my qualifi cation?


The requirement to take the continuing competence test came into force on 22/12/08. Anyone with a 4, 6 or 12 unit COTC (deemed competent for the EPOC) must do the test every two years.


Version 7 of the CIWM/ WAMITAB Operator Competence Scheme is of interest to site owners, operators & managers.


When booking your test - which costs £130 - make sure you also select the additional tests which apply to your site, in addition to the generic test. They are listed in the competence scheme.


Don’t forget to take photo ID (driving licence or passport) when attending the test centre. A pass in the generic test is 50% and the activity specifi c tests is 50%, subject to an overall pass mark of 65%.


You will be given your test scores on the day when you complete your test.


Try the practice questions on the WAMITAB website to familiarise yourself with what to expect.


Alternative to continuing competence?


It is worth mentioning that if you upgrade your qualifi cation - for example because of a permit variation (say from a six unit to a twelve unit award, then the date of issue of your new certifi cate is


relevant and the two year period applies from that date.


If you do follow this route, you may have to provide additional evidence for your existing six units to ensure they are up to date. You can no longer register to be reassessed for your qualifi cation to avoid doing the continuing competence test.


Concessions for new sites Make use of the 12 month grace period (from permit issue or start of operations) for medium risk non-landfi ll sites. You can do this by gaining the EPOC qualifi cation or 4 specifi ed units of the relevant qualifi cation within 4 weeks of the site becoming operational (rarely used, as 4 weeks is a short timescale in which to generate suffi cient operational evidence). Clearly if you obtain the 4 units for Low risk, then you have the required qualifi cation. For most TCMs, there is no issue with site attendance as they work at the sites they are covering. Where companies have more than one site, attendance should be agreed with your regulator. Some new sites must have at least 20% attendance in the fi rst 6 months of operation. Site operators should ideally negotiate with their regulator to agree a sensible level of cover, especially when their TCM is absent (leave, sickness etc). Ask your regulator and get their answer in writing rather than just referring to the risk tier table, then there is no doubt.


MARCO MUIA Marco Muia BSc (Hons) MSc MCIWM is


a Director of Oaktree Environmental Limited. He specialises in all aspects


of waste planning and regulation


consultancy. He also holds the level 4 COTCs for Hazardous Waste Treatment and Transfer. You can contact Marco on: 01606 558833.


If you have any questions about this article, e-mail him via:


marco@oaktree-environmental.co.uk Follow him on Twitter @wastechat


www.skiphiremagazine.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68