ripping everything out. JK has taken a more rigorous view. The JK system works with both insulated and uninsulated slabs, including alongside low-energy heat sources. The company has followed industry guidance to quantify heat loss through uninsulated slabs and to meet the criteria set out in Part L of the Building Regulations. The argument is a carbon one as much as an energy one: the embodied energy in an existing in-situ slab is considerable and the savings gained from removing and reinstating it do not offset that cost under the principles underpinning Part L and SAP. In short, the greenest slab is often the one that is already there. One team from design to completion For anyone who has chased accountability across a chain of subcontractors, this will be the most welcome line in the specification. JK’s systems are installed exclusively by its own trained, in-house engineers. The people who design the system are the people who fit it and one party answers for the result. That consistency is why installations
are frequently completed within a single working day, with minimal disruption to other trades and to the people using the building. There is no secondary flooring adjustment to coordinate, no additional materials to programme and no sub-floor preparation to price. The result is
The JK system at a glance • Single heating system: the only and primary heat source
• Zero build-up: embedded into the existing solid floor
• Bespoke: channels cut to your layout, on site
• Efficient: very low water temperatures, boiler or heat pump
• Affordable: no sub-floor work required • Quick: many installations completed in one working day
• Virtually dust-free: clean cutting, minimal disruption
• Zero build-up • One working day • No dust sheets required
a cost-effective route across commercial, residential and public-sector projects alike. Occupants feel the warmth within minutes. Built to be forgotten The best heating is the kind a client never has to think about again. JK’s Flextube pipe carries a 50-year warranty, among the most comprehensive in the industry. The stainless steel manifold, which balances water distribution across the system, is backed by 25 years. For specifiers, warranty length is a quiet
signal of how a manufacturer expects its product to perform. JK is prepared to put decades behind its own.
• Responsive: warmth felt within minutes • One party: in-house engineers fit the entire system Specify with confidence JK Floorheating has delivered public and private sector projects across a variety of countries for over 30 years. If your next scheme involves a floor you would rather not disturb, talk to the team early, ideally at concept stage, when a conversation about floor levels can save you a redesign later. For more details visit our website where
you can find several case studies or speak to the team.
https://jk-gb.com
sales@jk-gb.com 0333 006 3280
KG12
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60