A clear upgrade for AMC Hospital with Pyroguard’s fire safety glass


AMC Hospital, which is the largest healthcare facility in the Netherlands, has undergone a major renovation, which has modernised the 1,000-bed facility with a clear focus on enhancing the safety and well-being of staff and patients.


A


t the heart of the transformation was the replacement of over 10,000 m2 of out- dated wired glass, bringing the hospital in line with the highest industry standards, while achieving a state-of-the-art, contemporary aesthetic.


whilst also meeting the hospital’s stringent safety, design and performance standards.


Stefan van Gerven, Pyroguard’s Regional Sales Director, said: “During initial discussions, concerns arose about the compatibility of the existing timber frames with the new fire safety glass and the corresponding load requirements. We collaborated closely with Peutz, a specialist consultant, to test the existing frames as part of a complete system. This is where our extensive library of technical data proved instrumental, as we were able to confirm that the original timber could be retained, with the findings forming a key part of the renovation plans.


As part of the renovation, the decision was made to replace all existing wired safety glass with new, transparent glazing solutions from fire safety glass manufacturer Pyroguard, to ensure that the hospital adhered to current industry standards. This upgrade also addressed long-standing challenges with maintaining accurate product data records for the glass partitions and doors, many of which had been extended or replaced over the years without clear traceability. By upgrading the glass throughout the facility, AMC Hospital not only enhanced its aesthetic appeal and improved safety standards but also ensured data consistency across the entire site.


MedicomZes, a specialist in hospital construction and renovations, was entrusted with overseeing the project, while Glasdesign were appointed to fabricate and install the glazing systems. Given the scale and complexity of the project – set within a sensitive healthcare environment – MedicomZes approached Pyroguard as a trusted manufacturer with the capability of providing the required quantities of fire-resistant glass,


8 Summer 2025 M36


“Considering the scale of the project and the volume of glass required, we also recommended a sampling exercise to evaluate the potential glass types that could meet the specified criteria. This process allowed both the architect and building management team to make a more informed decision. An additional consideration for the architect was the need for a fire safety glass solution that would enhance privacy for both patients and staff, through the use of a satin finish.”


the hospital, incorporating both clear and satin fire safety glass. Pyroguard Protect (Pyroguard T EW30 and T EI30) was installed in areas requiring larger, bespoke pane sizes, delivering exceptional fire protection while aligning with the architect’s vision for aesthetic design.


Working with Pyroguard has been instrumental in ensuring we met the hospital’s safety and aesthetic goals. Their technical support and ability to address the specific challenges of the healthcare environment were invaluable.


Peter Blankers, Project Manager at MedicomZes added: “Working with Pyroguard has been instrumental in ensuring we met the hospital’s safety and aesthetic goals. Their technical support and ability to address the specific challenges of the healthcare environment were invaluable. The final result not only enhances the safety of the building but also contributes to a modern and welcoming environment for patients and staff.”


Throughout the project, it was crucial that the building remained operational to minimise disruptions to patients and staff. Glasdesign successfully completed what is only the first phase of the project on time, with the project scheduled for full completion in a few years.


Following the sampling exercise, Pyroguard Rapide (Impact 7mm and Impact Satin) was specified for the internal partitions throughout


For more information about Pyroguard, please visit www.pyroguard.eu


pyroguard.eu/case-studies/amc-hospital-the-netherlands


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32