FEATURE COVER STORY


INTEGRATING STANDBY GENERATOR SETS INTO DATACENTRES


continuous operation requirements and is currently available from the P400-1 through to our P2500-1 models.


There are many causes of data centre outages but loss of power doesn’t need to be one of them and a well-chosen generator set can take this concern away


f you’re thinking of installing a standby generator into a data centre’s power system, there are several key decisions.


I


GENERATOR SET SELECTION The first and most important decision is choosing the right generator set rating to meet demands from the critical UPS / IT and cooling / chiller loads (also called the N demand). If the data centre is likely to expand, this may change over time. The decision on whether the generator


set will supply power at high or low voltage depends on the size and overall scale of the data centre, on the tier distribution topology and on the actual space available to accommodate the generator sets. Typically when the N load requirements are above 4 -5 MW, high voltage is the best option. Critical UPS / IT load can influence generator selection in several ways: • UPS battery recharge which can be 10- 20 per cent of UPS rating. This power may need to be covered by the generator. In some cases, an operator may opt not to recharge when running the generator set. This will affect the design autonomy when transferred back to the mains and presents a risk which the data centre operator must consider. • Modern UPSs present quite low levels of harmonic current distortion (THDi) to the generator set although in situations


6 SEPTEMBER 2019 | IRISH MANUFACTURING


where the UPSs are in bypass mode, the higher harmonic distorting IT / Server load needs to be supplied by the generator set which may require an oversized alternator to ensure the quality of voltage waveform is not affected. •Most modern IT loads present a leading power factor by nature. This does not create an issue for UPSs in normal mode, but again if the UPS is in bypass mode, the leading power factor load must be supplied by the generator set directly and this may cause voltage instability issues which may require an oversized alternator. The effect of UPSs in bypass mode will depend on the UPS kVA rating in proportion to the generator / generators rating. A supplier will be able to provide detailed support on this and other aspects of generator set selection.


DATA CENTRE CONTINUOUS RATINGS The running duty of the generator set in data centre applications is very important, especially when looking at requirements defined by the Uptime Institute. FG Wilson in conjunction with our sister company Perkins have developed a Data Centre Continuous Rating which delivers unlimited hours of annual operation with no restriction on the average load factor up to 100 per cent constant load. This rating complies fully with Uptime Institute Tier III and IV


Critical UPS / IT load can influence generator selection in several ways


GENERATOR SET PACKAGE INTEGRATION After determining the rating and number of generator sets required to meet site load demands, the physical integration of the units means consideration of ambient, noise, local planning regulations and fuel autonomy. The outcome of these considerations influences the generator set package installation in terms of noise attenuators, exhaust silencers, cooling systems, package footprint, height and fuel storage. For example, if a very low noise level is required this will increase the size of attenuation, exhaust silencers and the overall package footprint, which of course will increase the package costs. It’s vitally important that the criteria are as accurate as possible at the concept stage of the project. A generator set supplier should be able to provide in-depth support during this development phase.


GENERATOR SET CONTROL SYSTEMS This covers a wide range of features and functions, many of them vitally important when delivering key control requirements for the generator set. For example, the ability to load sequence enables N+1 or N+2 functionally for redundancy. The extensive communication interfaces can facilitate interfacing with on-site management systems and enable operators to monitor the generator set remotely, improving 24/7 maintenance support. Redundant PLC control systems are essential for delivering a high level of availability when managing the primary power of the data centre, essentially the mains and standby primary incomers and distribution.


GENERATOR SET PROJECT DELIVERY When choosing a generator set brand it’s important to evaluate a supplier in terms of their ability to support in the definition of the project, the development of a project plan, the manufacturing, testing, site installation to the final commissioning and most importantly after sales maintenance support.


FG Wilson www.fgwilson.com T: 028 9049 5000





Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36