search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
MAINTENANCE & TESTING


Sites urged to test emergency power plans as disruption risks rise


Finning UK & Ireland is urging operators of commercial, industrial and critical sites to test emergency power arrangements as extreme weather, infrastructure faults and unplanned outages put renewed focus on site- level resilience


T


he power and energy specialist says organisations should not assume a reliable electricity network means their own site is protected from disruption, with National Grid advising that power cuts can still be caused by local faults, severe weather and other unforeseen events. In June, the Met Office recorded the UK’s highest June temperature on record at 37.7°C at Lingwood in Norfolk, warning that very high temperatures can affect transport, energy and water supply.


Separately, infrastructure incidents have also shown how quickly local power disruption can escalate. In March 2025, Heathrow airport had to close, and some 67,000 customers were affected after an outage at the North Hyde electrical substation. Flights were grounded for 16 hours as teams worked on the airport’s internal power network to test it and make it safe enough to be brought back online. In total, there were an estimated 25,000 unplanned power outages across the UK by the end of 2025, according to analysis by Utility Bidder, an increase of over 30% compared to the year previously. Martyn Drinkwater, senior sales manager for Electric Power at Finning UK & Ireland, said: “Having access to a generator is not the same as having a tested emergency power plan. The starting point should be understanding what needs to stay live, what comes on first, what the peak load looks like, how long the site needs to


Finning UK & Ireland is urging site operators to test emergency power arrangements as extreme weather and unplanned outages rise


run, and whether the system has been tested under realistic conditions. “That means looking at the load profile, starting


current, fuel requirements, controls, monitoring and maintenance before an outage happens. If those questions are only being asked once power has already been lost, the response is likely to be slower, more expensive and harder to manage.” Finning UK & Ireland supports customers with


permanent and temporary power requirements, including generator sizing, site surveys, load assessment, package design, installation support, commissioning, load-bank testing,


remote monitoring, service agreements and rental power where required.


Martyn added: “A backup system should be


treated as part of the site’s wider continuity plan. If the first serious test happens during an outage, it may be too late to find out the generator is incorrectly sized, has not been maintained, is short of fuel or does not match the site’s actual demand.


“For sites supporting life safety systems, data access, refrigeration, manufacturing processes or healthcare environments, that planning becomes even more critical.”


Essential reading for building services professionals and specifiers


u Magazine app optimised for reading on the Apple iPad


BSEE Vol.45 No8 August 2026


u Readers are notified automatically when a new issue becomes available


u Each issue is downloaded to your device for offline viewing


The MecFlow Fusion supply system is specifically designed to meet the tough standards required for today’s plantrooms, risers, headers and runouts.


don’t just buy


products, buy


solutions. Building Services & Environmental Engineer


AipsPegler-Adv.BSEE-Earpiece6,5x7,5.indd 1 Aalberts earpiece BSEE Apr25.indd 1


www.aalberts-ips.co.uk


u Interactive elements let you dig deeper into an article with just a tap or a pinch


27-02-2025 16:04 3/3/25 10:35


u Missed an edition? – visit the archive for previous copies of BSEE


u Fast page navigation and quick links enhance the reading experience


23291_POLYPIPE_MECFLOW_BSEE_PRESS_FC_AD_280X272.indd 1 Check out all the latest building services products - starting on page 31 BSEE-AUG26-PG01.indd 1 24/05/2024 13:46 27/7/26 10:28


Search for BSEE magazine on the App Store and Google Play Read the latest at: www.bsee.co.uk BSEE App hp BSEE Aug26.indd 1 27/7/26 15:24 BUILDING SERVICES & ENVIRONMENTAL ENGINEER AUGUST 2026 23


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38