search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
MARINE RENEWABLES & WINDFARMS


Global Offshore Awarded Array Cable Installation Contract at Parkwind’s Arcadis Ost 1 Offshore Wind Farm


Normand Clipper – one of the cable ships Global Offshore will be using on this contract


Global Offshore, a leading provider of cable installation, repair and trenching services to the offshore renewables, utilities and oil & gas markets, and part of the Global Marine Group, has been awarded a contract for the installation and burial of 27 array cables at Parkwind’s Arcadis Ost 1 offshore wind farm.


Arcadis Ost 1 is a 257MW offshore wind farm developed in the German territorial waters of the Baltic Sea, northeast of the island of Rügen. Arcadis Ost 1 has been developed by Parkwind with the participation of PMV and OstseeWindEnergie GmbH, a project company of the three partners Oberhessische Versorgungsbetriebe AG, Stadtwerke Bad Vilbel and WV Energie AG.


The wind farm will begin operations in 2023 and will supply enough green energy to power an equivalent of 290,000 households.


The scope of work will see Global Offshore carry out the project management and marine engineering; cable protection systems supply and installation, pre and post lay surveys, cable loading and laying, cable burial and post-burial survey. As part of the turnkey package, Global Offshore’s sister company, OceanIQ, will provide route engineering services for the project, with another of Global Offshore’s sister companies, CWind, providing crew transfer vessels and cable pull-in services.


Global Offshore will be utilising two of Global Marine Group’s versatile cable ships, Normand Clipper and Global Symphony, with work at the site commencing in the second half of 2022.


Mike Daniel, Managing Director at Global Offshore, said, “We are delighted to confirm this latest contract win, which will see us to provide the unsurpassed service to Parkwind that our customers have come to expect from Global Offshore. We have been providing


cable trenching, installation, burial, management, repair, and maintenance services to the offshore wind industry since the installation of the first European offshore wind farm two decades’ ago.


“With a dedicated in-house engineering department, an experienced project management team, and a wealth of capable offshore personnel, alongside specialist offshore assets, we are confident in our ability to ensure the success of this project.”


Elien Van Winckel, Cable Package Manager at Parkwind said: “We are pleased to award the Arcadis Ost 1 cable installation contract to Global Offshore. They have been selected for their extensive expertise and know-how in dealing with particularly challenging soil conditions.”


Arcadis Ost 1 is a 257 MW offshore wind project developed by Parkwind. The wind farm will be located in the Baltic Sea, northeast of the island of Rügen in Germany.


September 2021 www.dockyard-mag.com 45


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52