search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Focus on Australia |


ground conditions. In addition, as utilities start to install covered conductor on a ‘business as usual’ basis, costs will reduce further as the supply chain develops local warehousing, greater efficiencies of scale and local technical support. In addition, a study by CSIRO (Commonwealth Scientific and Industrial Research Organisation) found that this type of covered conductor reduces bushfire risk by 98%.


This makes it the most cost-effective solution for bushfire mitigation from electrical lines. Furthermore, it has a design life of 40 years – the same as bare wire.


New-generation covered conductor is used widely around the world. It is particularly well established in Scandinavia, where it carries power to remote communities in densely forested regions. Like Australia, the covered conductor avoids faults arising from weather, wildlife and trees falling.


Meanwhile, it is used in the Middle East to protect lines from erosion and corrosion in coastal desert areas.


Utilities in India also use it along wildlife corridors, where elephants feed from leaves growing at the same level as power lines. With covered conductor in place, the elephants face reduced risk of electrocution.


Made for Australia


Seeing an opportunity to deploy the technology in Australia, consultancy Groundline Engineering secured funding from Victoria State Government to develop a new type of covered conductor specially for the Australian market. It then partnered with Amokabel to develop the new product.


Groundline Engineering’s director, Ian Flatley, explains: “The environment in Victoria is particularly harsh. We have high ambient temperatures in some areas, as well as low temperatures in some rural and mountainous regions. We also have extremely strong UV exposure that the insulation material needs to withstand.


“The insulation material also needs to cope with abrasion that may take place when the wind rubs a line against a tree branch or tree trunk. “We chose Amokabel as a partner as they have extensive experience in covered conductors and are able to offer flexibility to help their customers develop tailored products.


“They worked with us to develop a new covered conductor with three layers. A semi- conductive inner layer provides flexibility, and a high-grade electrical insulator forms the middle layer. Lastly, a tough polymer material is used as the outer layer to withstand mechanical abrasion as well as UV radiation from the intense sunlight. “We then delivered an extensive programme of testing at Swinburne University to check for resistance to UV, abrasion, electrical and mechanical testing in South East Australian environmental conditions. The cable met or exceeded all the requirements under Australian and international standards, as well as project- specific requirements.”


Three sizes of covered conductor were then introduced. The smallest has a 25 mm2


cross


section, employing an aluminium-clad steel conductor, and was developed specifically for the country’s rural and remote areas, where loads are smaller and galvanised steel conductors are often used.


The mid-sized version is a standard product with a 62 mm2


cross section. It is intended as a


direct replacement for aluminium alloy conductor (AAC) and aluminium conductor steel reinforced (ACSR) lines.


The largest is an all aluminium alloy conductor (AAAC) sized 159 mm2


. It can be used as a direct


replacement for multi-phase AAC distribution networks in urban, semi urban and rural areas.


First deployment, by United Energy The first utility to install the new form of covered conductor was United Energy. This DNO serves more than 660 000 customers via its 13 000 km network in eastern and south eastern Melbourne, and the neighouring Mornington Peninsula.


12 | July/August 2021 | www.modernpowersystems.com


It wanted to evaluate the conductor on its three-phase and SWER networks so selected two trial sites, in the towns of Mordialloc and Cape Schanck, which are south east of Melbourne. Groundline Engineering installed covered conductor at the two sites in 2016 and these have been operating successfully ever since. Building on this experience, United Energy has adopted covered conductors elsewhere on its network, focusing on high-risk bushfire areas. For example, the utility has used the technology on two of the longest spans in its network. With conventional bare wire, long spans like these have elevated risk of clashing in high winds, raising fault conditions and creating sparks.


The 270 m and 330 m spans in question run through a heavily vegetated area of Mornington Peninsula where adding new poles would be extremely challenging.


Two other nearby utilities have also adopted covered conductor.


Powercor is Victoria’s biggest utility, with 820 000 customers and a network of 88 000 km. In May 2021, it upgraded a total of 50 km of its SWER line with covered conductor near the towns of Geelong and Bendigo. It is now experimenting with larger projects, as is the state’s transmission network operator, Ausnet.


Huge potential


With the Victorian Royal Commission having recommended that utilities focus on protecting lines running through areas where bushfire risk is highest, there is huge potential for the country’s SWER lines, which total about 200 000 km in length, including through areas at extremely high risk of bushfire.


Covered conductor is the only economically viable solution to protect these communities from bushfire, but it also protects reliability and continuity of supply.


Learn more about covered conductor at amokabel.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89