| Turbine technology 1700 MW of HL will replace coal in Romania


Siemens Energy and independent power producer Mass Global Energy Rom SRl have signed a contract for the supply of HL-class gas turbine technology for the Mintia combined cycle power plant in Romania. With a maximum power generation efficiency of more than 64%, the plant will be the most efficient gas-fired power plant in Romania and one of the most efficient gas-fired plants in Europe. It will have an installed generating capacity of 1700 MW and will replace a retired coal-fired power plant.


“This project is a prime example of how the determination of policy-makers, private


>64% combined cycle efficiency


33 KEBH/


1,250 ES Best-in-class serviceability


investors, and technology providers can make a significant difference in accelerating the energy transition while also balancing the energy trilemma. Our latest HL-class gas turbine technology in combined cycle configuration will replace the capacity of the old coal-fired Mintia power plant and slash CO2


emissions by more than 50 percent when completed,” said Karim Amin, member of the executive board of Siemens Energy. “With our first project in Europe, we’re building one of the most modern and environmentally friendly gas-fired power plants,” said Ahmad Ismail Saleh, owner of Mass Global Energy Rom SRl. “It’s not only a strategic investment in the Romanian energy sector, the new


85 MW/min ramp rate


50%vol. 880 MW 50Hz


655 MW 60Hz combined cycle power output


593 MW 50Hz


440 MW 60Hz simple cycle power output


The SGT-9000HL hydrogen co-firing capability


<30% minimum environmental load (MEL)


power plant will mark the beginning of the decarbonisation of the region’s former coal- fired power generation with planned simple cycle operation


by the first half of May 2025 and combined cycle completion in the first quarter of 2026.” The new plant will be fired with domestic natural gas.


The Siemens Energy scope of supply includes two SGT5-9000HL gas turbines with associated generators, an SST5-5000 steam turbine with SGen-3000W generator, and an SPPA-T3000 control system.


In the 50 Hz market, it is Siemens Energy’s first HL-class power plant in a 2x1 multi-shaft configuration.


The plant will be located at the existing Mintia power plant site about seven km from Deva in the Transylvania region.


Oil Mist Separators reliable • efficient • low-maintenance


For gas turbines, steam turbines, hydro turbines, compressors, gas and diesel engines and gears.


High quality made in Germany


Individual design according to customer requirements Your contribution to environmental protection


For more information visit: www.franke-filter.com www.modernpowersystems.com | March 2023 | 19


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45