| Hybrid systems


What materials are used in the buoy’s structure and chain system to ensure long-term durability in freshwater and reservoir environments? The buoy is made from UV resistant polymer and filled with internal foam. The winch is made from galvanised steel to ensure corrosion resistance while maintaining low cost. Battery and wireless communication are fitted in a sealed enclosure.


How is corrosion and biofouling managed in the Tension Buoy design, particularly in tropical or sediment-rich reservoirs? Those sites where level of fouling is severe, buoy size and net buoyancy must be dimensioned to handle the additional mass. The added viscous drag on the buoy from biofouling is minimal compared to the tension level on the buoy from the mooring lines. As for fouling on the chain itself, the subsurface roller and top side gipsy wheel removes this during operation.


How does installation and commissioning of a Tension Buoy differ from a conventional fixed mooring system in terms of time, cost, and technical requirements? Anchors are typically preinstalled with chain held available at surface with surface buoys. Buoys are towed to position and chain fed into the winch from a work boat. From there, each winch tensions itself based on command from the central controller. This eliminates the need for manual tensioning on installation, eliminating need for heavy duty equipment as well as the need for quality control of tension level during installation.


What maintenance regime is recommended for the automatic winch and its moving parts, and can maintenance be performed without retrieval of the buoy? Given the relatively slow changes in water depth at a reservoir, the winch can be operated at low frequency, typically minutes per day or less, so operational hours are few over a year. Except for the lower guide pulley, which is mounted on slide bearings, there are now moving parts that are submerged. Otherwise, all moving parts are accessible from top of the buoy from a surface vessel.


How is system health monitored – is there remote telemetry or condition-based maintenance integrated into the design? Yes, at each winch, current consumption of the winch motor and mooring line tension is monitored. As these two parameters are correlated, this allows for remote condition monitoring of the whole drive train.


What redundancy or fail-safe mechanisms are in place if the automatic tensioning system fails or loses power?


A number of fail-safe functionalities are available, subject to FPV system size, water level variations and environmental conditions. A back-stop at the end of the return chain will ensure chain is not allowed to slip through the winch and fall to seabed, while the weight of the chain will always provide a certain tension in the mooring line.


In case of power failure at one winch, the communication link will immediately be reported down


and as such notify the failure. Water level variations, and hence need for chain length adjustments, are slow, so there is ample opportunity for operators to inspect and repair/replace power system at one winch.


How does Tension Buoy integrate with existing floating PV array mooring layouts – does it require specific array geometries or anchoring patterns? The only requirements for integration of the Tension Buoy is that it needs to be integrated along the perimeter of the floating PV array, and the chain needs to be allowed a certain minimum angle to vertical plane, typically minimum 30 degrees (meaning horizontal footprint of 50m at 100m max water depth)


Have you conducted pilot projects or trials on operational hydropower reservoirs, and if so, what were the observed performance outcomes? We are currently doing a joint pilot project with Energias de Portugal (EDP) at one of their largest hydroelectric reservoirs in northern Portugal. The system was built and tested in Norway and has now been successfully installed on the reservoir.


What are the key considerations when retrofitting Tension Buoy systems onto existing hydropower reservoirs with fluctuating heads or drawdown zones? Operating in fluctuating heads (from water level variations) is the core functionality of the Tension Buoy, so the only considerations is proper dimensioning of the chain length. As for drawdown zones, the buoy can end up and rest on dry land without taking damage and will float back up in position as water level rises again.


How does the system interface with hydro plant operations – is there potential for communication between dam management systems and Tension Buoy controllers to optimise operations? Absolutely, the Tension buoy controllers are operated over wireless LoRa Node infrastructures, a high range, low power communication infrastructure. Currently, we use encrypted MQTT as communication protocol, but this is adaptable to suit the communication and control system implemented at the hydro power plant.


How scalable is the Tension Buoy for large FPV arrays (tens or hundreds of MW) – what are the engineering or economic limits? Tension buoy is in principle a mooring point available at the water surface (with small horizontal footprint, as opposed to the long horizontal stretch of typical mooring arrangements for FPV on hydro dams). It replaces long ropes stretches and extensive use ofcostly flexible tension members with standard mooring chains, offering considerable cost savings on hardware cost and cost of installation.


Are there plans to adapt the technology for other variable-water-level applications, such as pumped storage reservoirs or tidal lagoons? Yes, the Tension buoy is a mooring system suitable for all cases of variable-water-level applications such as reservoirs (incl. Pumped storage), tidal lagoons or shoreline sites with large tidal variations .


Above: Installation in Risør, Norway


Further information


For more details please visit: https://fredolsen1848.com/


www.waterpowermagazine.com | December 2025 | 19


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45