search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
| Civil works


whole project (ie fixed sum or guaranteed maximum price), rather than by unit prices. “Design-build contracting is more common with complex, large projects that are subject to greater uncertainty, and these contracts tend to avoid changes that occur with the discovery of some unexpected issues that can substantially impact project budget and timeline,” Duda et al state.


Knowledge gap As the authors reported: “What has been lacking, but


greatly needed, in the literature of dam removal is empirical data on the cost of dam removal projects and associated analyses about how the cost varies among dams, their characteristics, and the watersheds and regions in which they reside.” To address this gap, the authors compiled cost data for 668 dam removals from a variety of sources, showing geographic trends in dam removal costs across the US over the past five decades. The total indexed cost of dam removals was US$1.522B, and assuming such costs were representative of the 1916 dams removed in the US to 2022, the authors estimate the total cost for removing dams on US rivers is in the region of US$4.4B dollars. Seventy-seven percent of reported costs were for


projects where a single dam was removed, whereas 150 dams were removed as part of 53 multi-dam removal projects involving between two and 18 dams. There were far more small dams (542 were less than 5m in height). There were 77 medium height dams (5m–10m), and only 30 large dams over 10m high. Nineteen dams with cost estimates did not have a height estimate. However, the authors suggest it is likely most of the dams lacking height information were less than 5m tall. With a strong likelihood that dam removal will continue to increase, between 4000 and 32,000 more US dams could be removed by 2050, the authors warn that there “is a pressing need to improve the volume and quality of empirical dam removal cost data to better inform dam removal planning”. Indeed, such data could be coupled with other emerging science and tools that describe how to prioritise, conduct, study, and manage dam removal projects. As the authors conclude: “A national database of


dam removal costs that included component cost breakdowns, the presence of cost drivers aside from construction costs, and accurate demographic data on the dams (eg location, age, height, sediment volume) would dramatically improve the ability to learn from past projects and predict the costs of future projects.”


Geography matters Meanwhile, in a comparison of experiences when


removing dams on the Selune River in France and the Elwha River in the US, Marie-Anne Germaine and Laurent Lespez give an insight into why geography matters in big dam removal projects. In ecological river restoration projects, geography


is still too often analysed mostly as a “study area”, the authors explain. However, it shouldn’t just be invoked here to describe the context of projects, but to analyse environments and their transformations, inviting consideration of the relationships between human and non-human entities. “Dam removal cannot be reduced to an engineering


operation,” they state in their report published in Frontiers in Ecology and Evolution, adding that dam removal “disrupts spatial configurations by removing reservoirs, transforming associated uses, and producing new places”.


Opposition In their research, Boucher and Hudson look at


community opposition to dam removal projects. Focusing on the 36m high Vezins dam on the Selune River in France, the authors explain that in 2019 this was the largest dam removal project in Europe. In an effort to restore ecological connectivity and improve water quality, French authorities had ordered removal of this century old structure, but had neglected to foster effective communication with local communities regarding dam removal benefits and riparian stakeholder values. As the authors state, international, national, and


regional-scale actors played influential roles in the French decision to impose the dam removal project upon the local population of the Selune basin. Although often viewed as a positive benefit in many cases, here the dam removal lacked community support. There was strong, and at times even violent, opposition to removing the dams. The opponents of dam removal included a range of local stakeholders such as politicians, recreational (fishing) interests, small industry, and nature enthusiasts. There was a lack of understanding of how the dam supported a range of valuable local environmental services and economic activities, including nautical, hiking, climbing, photography, firefighter and rescue training, fishing, and drinking water. In addition the flora and fauna that evolved within the dam and reservoir area over the last century was diverse and rich. Economic developments, such as bed and breakfast, fishing shops, had also become part of the local socioeconomic riparian landscape. “At the core of the opposition is a desire for local


stakeholders to work together to clarify concerns that emerged as opponents questioned the consequences of the proposed dam removal based on their local knowledge and lived experiences,” the authors wrote. “The lack of feedback on these concerns and the withholding of information (due to a lack of consultation) crystallized local opposition.” Boucher and Hudson conclude that the failure of government authorities to effectively incorporate stakeholder values substantially compromises future large-scale federal environmental management projects dependent upon local community support. By examining how local actors experienced dam removal, they add that their study results increase understanding of environmental governance and the local consequences of national policy decisions in future dam removal projects – in France and internationally.


Right: Opponents of dams usually protest against their construction. However, recent experience in France has shown how local stakeholders opposed the removal of the Vezins Dam. There was a lack of communication and understanding about how the dam supported valuable local environmental services, such as hiking


www.waterpowermagazine.com | October 2024 | 31


Above: There is a pressing need to improve the volume and quality of empirical dam removal cost data to better inform the planning process


References


Duda JJ, Jumani S, Wieferich DJ, Tullos D, McKay SK, Randle TJ, Jansen A, Bailey S, Jensen BL, Johnson RC, Wagner E, Richards K, Wenger SJ, Walther EJ and Bountry JA (2023) Patterns, drivers, and a predictive model of dam removal cost in the United States. Front. Ecol. Evol. 11:1215471. doi: 10.3389/ fevo.2023.121547


Germaine M-A and Lespez L (2023) Why does geography matter in big dam removal projects? Lessons from a comparison between the Selune and Elwha River cases. Front. Ecol. Evol. 11:1250857. doi: 10.3389/ fevo.2023.125085


Zayane Boucher, Paul F. Hudson. Troubled waters: Riparian ecosystem services and community opposition to the largest dam removal project in Europe, Vezins Dam, France. Geoforum Volume 147, December 2023, 103906


https://doi.org/10.1016/j. geoforum.2023.103906


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49