search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
LIMBERG HYDROPOWER PROJECT, AUSTRIA


SAFE UPWARD MISSION IN HARD ROCK


Tunnelling at a gradient of 42° through hard rock requires bold miners, and special features on the TBM to ensure safety: the Herrenknecht Gripper TBM for the Limberg hydropower project is reliably prevented from slipping backward by the gripper and an innovative knuckle lever device in the twin anti-slip gripper unit. The machine thus remains securely wedged in the rock at all times. herrenknecht.com/limberg


Contractor:


Marti Tunnel AG Machine data: 1× Gripper TBM Diameter: 5,800mm


© Marti


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41