| CONTENTS
16
Barry Gilsenan in a tunnel for Hinkley Point C power plant’s cooling water system Image courtesy of Balfour Beatty.
Comment 3
10 26 30
REGULARS 7 News 14
42 Events
10 14 16 26 30
34 38
34 September 2026 | 5
Guest Editorial
Where did The Engineer go? Alastair Smith, BTS Chair A perspective on what has changed over the last few decades, and arguably lost - and recommendations.
BTS, BTSYM
Preview T&TI Spotlights on the upcoming calendar highlights of the BTS conference (6-7 Oct) and BTSYM conference (23 Oct).
Shafts/caverns
Tunnels offshore Barry Gilsenan, Balfour Beatty Report from the BTS meeting on the marine tunnels built for the cooling water system of the Hinkley Point C nuclear power plant, in south west England.
Long, wide and tall T&TI
A look at the large caverns across the world built for underground hydropower complexes.
Technical
Shotcrete inspection Dean Brox, Consultant A case for more regular inspections of shotcrete-lined hydropower tunnels in operation in light of data on problems.
Insight
H&S - compress air Dr Donald Lamont, H&S consultant A look back over the development of compressed air working knowledge, guidance and rules upon the 30th anniversary of the Work in Compressed Air (WCA) regulations.
BIM T&TI
ITA guidance on BIM use in bored and conventional tunnelling projects.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45