Challenging crossing between two artificial islands under the seabed with low overburden. Herrenknecht is supplying the XXL Variable Density TBM (Ø 14m), equipped with an accessible cutting wheel and additional technical features to master this task. herrenknecht.com/hrbt
Owner:
Virgina Department of Transportation (VDOT) Contractor:
Hampton Roads Connector Partners (Joint Venture of Dragados USA, Vinci Construction Grands Projets, Flatiron Constructors, Dodin Campenon Bernard)