PROJECT OF THE MONTH | NOVEMBER 2022


O


perating at a height of 14m, Bangladesh based, MKK Logistics, an Enterprise of Shams Group of Companies, has


used an Enerpac SBL900 hydraulic gantry crane to successfully install a 130t HPIP turbine at a 718MW Combined Cycle Power Plant at Meghnaghat in Dhaka. Combining the High Pressure (HP) turbine


and Intermediate Pressure (IP) turbine into a single casing, the HPIP turbine is a compact turbine with a smaller installation footprint. The challenge facing MKK Logistics was


how to lift the turbine 14m to the second floor of the Power Plant building and then install it. “Given the lack of space and restricted building access, we felt confident that our compact Enerpac SBL900 hydraulic gantry could be used to progressively lift the turbine and then position it ready to be fully installed,” said Taher Ilias, assistant general manager, MKK Logistics. MKK Logistics calculated that using steel


wire slings and utilising the 11m maximum lift height of the SBL900 at the second stage, the turbine could be lifted 14m in two steps.


First the SBL900 gantry and skidding


track were hoisted to 14m using the building’s overhead crane. Once assembled the gantry was skidded


above the turbine. Using linked steel wire slings attached


to the gantry header beams, MKK Logistics first lifted and held the turbine at 7.8m while a steel platform was put in place to rest the turbine on. For the final lift to 14m, single slings were attached to the turbine and SBL900 header beam, and the gantry raised clear of the building’s second floor. The HPIP turbine was then skidded to


a resting place. Although the turbine was facing the right direction, the SBL900 gantry and skid track had to reconfigured by 90 degrees to skid the turbine into its correct position ready for installation. “We were delighted with the power and


reach of the Enerpac gantry, providing just what was required for this demanding lifting project,” added Ilias. MKK Logistics (an enterprise of Shams


Group of Companies), is one of the largest asset based multimodal logistics service provider in Bangladesh, providing a logistics service especially in both inland and river based transportation of heavy lift and project cargo, customs clearance, equipment rental etc and a complete door-to-door logistics solution all across Bangladesh. ●


R HPIP turbine lifted to 14m


R Final resting position for the HPIP turbine www.hoistmagazine.com | November 2022 | 11


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53