search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Specification • 12m internal clear height


• 38m-deep yard (28m in concrete) excluding truck parking spaces


• FM-approved ESFR sprinkler system


• 50kN/sqm floor loading, 90kN per leg footplate


• 2.4m concrete plinth around the building exterior


• Floor flatness in accordance with DIN 18202 Table 3 Line 4


• 22KV (medium voltage) power supply, total available load of 13MW


• 300 lux LED lighting in warehouse, storage and handling areas and 500 lux lighting in offices


• Heating to 17ºC in warehouse, 21ºC in offices


• Fitted offices and social areas provided with climate control


• PV panel-ready • Highly energy efficient building design


The distribution centre will be located in a landscaped setting with trees and planting. Bicycle parking and electric charging are designed into the facilities.


Sustainability and energy efficiency


• Highly insulated roof and façade (U = 0.2 W/m²K) • Roofing prepared for photovoltaic energy generation • Electric vehicle charging points • Targeting BREEAM Excellent sustainability rating • District heating and central steam supply available


High-quality building management support


Verdion will manage the building following completion and be occupiers’ main point of contact.


Our team will handle all commercial and insurance requirements and work closely with the facilities manager to ensure that the space meets occupiers’ needs.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6