Masterplan
Warehouse and logistics accommodation areas can be configured to occupiers’ specific requirements. This page shows indicative layouts that can be adapted further as required.
Warehouse (sq m) Offices (sq m)
Mezzanine (sq m) Total
Dock Level Doors Level Entry Doors Car Parking
N
Unit 1 7,920
400 934
9,254 8
2
Unit 2 7,188
400
1,088 8,676
8 1
Including accessible parking and spaces for electric vehicles
Masterplan not to scale. For indicative purposes only. Warehousing
Offices & core Specification
Warehouse • 12m internal clear height • 24m x 12m column grid • Warehouse floor load 50 kN/m2 • Mezzanine floor load 5 kN/m2 • Floor flatness in accordance with DIN 18202 table 2 line 3 and 4 • Point load 75 kN (rack-loading / leg footplate 150 x 150mm) • FM sprinkler installation with ESFR K360 sprinkler heads • LED fixtures with motion sensors • 2.4m concrete plinth around the building exterior
• Secure 36.50m-deep yard (25m in concrete) with dual access from public road
• 200 lux LED lighting in warehouse storage area, 300 lux in warehouse handling area, 500 lux lighting in offices
• CO2 neutral heating
Office • Cable ducts for telephone and data wiring • Top-down cooling of offices and meeting rooms • Flexibility to provide additional office space
Sustainability and energy efficiency
• Highly energy efficient building design (KFW EH 40 EE 55 energy efficient standard)
• No fossil fuel primary energy sources
• Roofing and electrical infrastructure prepared for photovoltaic energy generation
• 12 EV charging points • Targeting DGNB Gold sustainability rating
Total 15,108 800
2,022 17,930 16 3
113 Mezzanine
Storey Offices
Two Phase 2 Parking - 232no. spaces
Emergency Turning Area
Stair Core
Tech Room
Mezzanine
Level Entry Door
Dock Level Doors
4 UNIT 1
Dock Level Doors
Level Entry Door
Stair Core
Tech Room
Accessible Parking Spaces
Stair Core
4 UNIT 2 New Phase 1 / 2 Site Exit Road Ext.
Sprinkler Tank
Mezzanine stairs
8
Dock Level Doors
Level Entry Door
Tech Room
Accessible Parking Spaces
Storey Offices
Two
56 Staff Parking Spaces
3no Lorry Parking Bays 35m Service Area
Pump House
35m Service Area
57 Staff Parking Spaces 3m Landscape protection zone 20m New Landscape Buffer Zone
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7