(10) In the event that the MMO becomes aware that any of the materials on the audit sheet


cannot be accounted for it shall require the undertaker to carry out a side scan sonar survey to plot all obstructions across the relevant area(s) within the offshore Order limits where construction works and related activities have been carried out. In the event that the missing material is not located, the survey area may be extended at the discretion of the MMO. Local fishermen shall be invited to send a representative to be present during the survey. Any new obstructions that the MMO believes to be associated with the authorised scheme must be removed at the undertaker’s expense.


(11) The undertaker must inform the MMO of the location and quantities of inert material


disposed of each month under this licence, by submission of a disposal return by 31 January each year for the months August to January inclusive, and by 31 July each year for the months February to July inclusive.


(12) The undertaker must ensure that only inert material of natural origin, produced during


construction drilling and seabed preparation for foundation works and cable sandwave preparation works shall be disposed of within the offshore Order limits (disposal site reference TH23 East Anglia ONE).


(13) The undertaker must ensure that any rock material used in the construction of the


authorised scheme is from a recognised source, free from contaminants and containing minimal fines.


(14) In the event that any rock material used in the construction of the authorised scheme is


misplaced or lost below MHWS, the undertaker must report the loss to the District Marine Office within 48 hours and if the MMO shall reasonably consider such material to constitute a navigation or environmental hazard (dependent on the size and nature of the material) the undertaker must endeavour to locate the material and recover it.


(15) The undertaker must undertake the survey agreed under condition 11(g)(iii) following the


high resolution swath bathymetric survey referred to in condition 19(2)(d). Should any such obstructions be identified which may reasonably be considered to interfere with fishing the undertaker must take reasonable steps to remove them.


Force majeure 9. If, due to stress of weather or any other cause the master of a vessel determines that it is


necessary to deposit the authorised deposits outside of the Order limits because the safety of human life and/or of the vessel is threatened, within 48 hours full details of the circumstances of the deposit must be notified to the MMO.


Pre-construction plans and documentation 10. The licensed activities or any part of those activities shall not commence until the following


(as relevant to that part) have been submitted to and approved in writing by the MMO—


(a) a design plan at a scale of between 1:25,000 and 1:50,000, including detailed representation on the most suitably scaled admiralty chart, to be agreed in writing with the MMO in consultation with Trinity House and the MCA which shows—


(i) the proposed location and choice of foundation of all offshore substations; (ii) the height, length and width of all offshore substations;


(iii) the length and arrangement of all cables comprising Work No. 3A; (iv) the dimensions of all gravity base foundations; (v) the dimensions of all jacket foundations;


(vi) the proposed layout of all offshore substations including any exclusion zones under condition 2 and/or identified under condition 11(h)(iv);


(vii) a plan showing the indicative layout of all offshore substations including all exclusion zones (insofar as not shown in paragraph (vi)) and showing the indicative


122


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131