search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
EXTERIORS 39


Riverside Quarter is the fi rst development in the UK to specify Pre-Assembled Frames (PAF) – designed, engineered and manufactured by EOS.


In addition to the Thrubuild® loadbearing


range, we have researched and developed Thruwall® – fully engineered custom-designed non-loadbearing infi ll systems manufactured off site and supplied as a certifi ed kit of parts that can be used with concrete and steel main frames. Following the outstanding success of


with certifi cation bodies to jointly develop and design technical solutions. By eliminating uncertainty through rigorous


testing regimes, EOS deliver light steel framing systems with certifi ed and predictable performance. Recently presented with Best External Product trophy at the Housebuilder Product Awards, Thrubuild® is an all-in-one non-combustible certifi ed system exploiting the latest products, technical know-how and manufacturing excellence of the combined Etex team. Providing crucial safety, time and cost benefi ts, the Thrubuild® range has multiple loadbearing applications for low and medium rise developments and can be used for external or internal walls together with internal and separating fl oors.


Thruwall® – EOS has taken factory prefabrication and preassembly to another level. Developed and rigorously tested, Pre-Assembled Frames (PAF) are an evolution of Thruwall® which is delivered to site as a unitised non-loadbearing infi ll system encapsulating light steel framing and external sheathing. Both Thruwall® and PAF systems are suitable for buildings with a height of more than 18 metres. All components and products in the


Thrubuild®, Thruwall® and Pre-Assembled Frames system range have been rigorously tested together for fi re, acoustic, weathering, airtightness, durability and mechanical performance. Fire resistance periods of 60, 90 and 120 minutes are predictably achievable.


30-YEAR WARRANTY A fragmented supply chain will result in components being off ered by a multitude of manufacturers, therefore warranties are complex, for very limited timescales or simply non-existent. This uncertainty also extends to the costs involved, the speed of build and the quality of the fi nal outcome.


When walling and fl ooring systems are built with Etex Group components and materials, following a validation process — Etex award a 30-year warranty. Advanced light steel framing systems manufactured off site in well managed factory environments not only mitigate risk but also enhance the speed and quality of the build process. Robust testing regimes backed by comprehensive warranties off er assurances to developers and no doubt help specifying teams sleep at night safe in the knowledge that they have safeguarded building owners and occupants.


01325 30 30 30 eosenquiries@etexgroup.com


SPECIFY WITH COMPLETE CONFIDENCE


Construction clients can now reduce risk and operate with more certainty and confi dence at every stage of the construction journey by adopting the EOS light steel frame systems approach. Our ground-breaking range of loadbearing and non-loadbearing walling and fl ooring systems have been rigorously tested and certifi ed for fi re, acoustic, weathering, airtightness and mechanical performance.


ADVANTAGES OF A SYSTEMS APPROACH


• 30-year Etex warranty • Euroclass A1 non-combustible • Fire tested 60 - 120 minutes • Suitable for buildings over 18 metres • Delivers crucial programme savings of up to 30%


THE SAFER, FASTER AND MORE COST-EFFICIENT WAY TO BUILD


To discover more about Thrubuild®, Thruwall® and Pre-Assembled Frames go to the EOS information centre: www.eosframing.co.uk/information-centre


THRUWALL PAF®


HBD06_EOS_Safety & Security - Smoke & Fire Protection_DPS-Adv.indd 3


25/05/2022 11:49 LISTEN HERE


WWW.BUILDINGCONSTRUCTIONDESIGN.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46